|
<br />
<br />l
<br />
<br />1
<br />
<br />1
<br />
<br />PROFESSIONAL LICENSES
<br />rl AND REGISTRATIONS
<br />Professional Engineer, Florida
<br />No. 47558, 1994
<br />
<br />~ 1 Advanced Work Zone Traffic
<br />Control
<br />
<br />,r I EDUCATION
<br />B.S. Civil Engineering, Florida
<br />International University, 1985
<br />
<br />~ I ~:ARS EXPERIENCE
<br />
<br />~ I
<br />
<br />, 1
<br />
<br />I I I
<br />
<br />, 1
<br />, I
<br />
<br />r 1
<br />I
<br />, J
<br />
<br />, J
<br />
<br />I
<br />l J
<br />
<br />I . I
<br />I
<br />I ,J
<br />I
<br />I
<br />I
<br />
<br />, I
<br />
<br />I
<br />
<br />I
<br />
<br />I I
<br />I
<br />
<br />~....~.
<br />..~...
<br />
<br />CSA Group
<br />
<br />TECHNICAL EXPERTISE
<br />Mr. Chavez has 25 years highway design experience with both the public and private sector. His emphasis has
<br />been roadway design, plans production, and project management. Mr. Chavez has extensive experience and
<br />knowledge of the Rorida Department ofTransportation's (FDOT) procedures and standards.
<br />
<br />RELEVANT EXPERIENCE
<br />1. CSA Group, Florida
<br />. 2009-Present: Vice President - Responsibilities include directing and managing the design and
<br />production of roadway projects, technical and cost proposal preparation, marketing, project management,
<br />subcontractor management, quality control review of roadway design projects, and client interface.
<br />. 2001-2008: President - Responsibilities include directing and managing the design and production of
<br />roadway projects, technical and cost proposal preparation, marketing, project management,
<br />subcontractor management, quality control review of roadway design projects, and client interface.
<br />. 1996-2001: Director of Transportation - Responsibilities included design and production of roadway
<br />projects, technical and cost proposal preparation, project management, subcontractor management,
<br />quality control review of roadway design projects, client interface, and coordination of FOOT projects.
<br />
<br />2. David Plummer & Associates, Inc.
<br />1993-1996: Senior Associate/Chief Highway Engineer - Responsibilities included design of roadway
<br />projects, project management, proposal preparation, scheduling, staffing, training, budgeting,
<br />subcontractor management, and client interface.
<br />
<br />3. Post, Buckley, Schuh & Jernigan, Inc.
<br />1988-1993: Project Engineer - Responsibilities included supervision and preparation of all components
<br />associated with a final roadway set of plans, engineering reports, cost estimates, budgeting, and
<br />scheduling. Performed design work that involved conventional solutions but also design work involving
<br />complex design features requiring innovative solutions.
<br />
<br />4. David Plummer & Associates, Inc.
<br />1985-1988: Design Engineer - Responsibilities included plans preparation of urban and interstate
<br />roadway projects including pavement marking design, drainage, maintenance of traffic, computation
<br />books, and cost estimates.
<br />
<br />PARTIAL LIST OF PROJECTS
<br />INTERCHANGE DESIGN EXPERIENCE:
<br />. 1996-2008: S.R. 826 (Palmetto Expressway) Interchanges at Miller Drive, S.R. 874 and Bird Road,
<br />Miami-Dade County, FL. Project included approximately 2.2 miles of limited access mainline
<br />reconstruction, three interchange reconstructions, reconstruction of crossroads, and 11 bridge structures
<br />fully designed in metric units. One of the interchange designs consisted of a single point interchange; the
<br />first of its kind for the county. Client: Florida Department of Transportation District Six, Contact Person:
<br />Jason Chang, (305) 470-5331
<br />· S.R. 826 (Palmetto Expressway) Interchange at N.W. 36 Street, Miami-Dade County, FL - Project included
<br />final design plans for approximately 1 mile of limited access mainline reconstruction, widening, and an
<br />interchange reconstruction. The interchange design consisted of two fly-over ramps and a total of four
<br />bridge structures. Client: Florida Department ofTransportation District Six, (305) 470-5100
<br />· Palmetto Improvement Program (S.R. 826), Miami-Dade County, FL - As a design engineer for the
<br />Palmetto Improvement Program, work experience consisted of developing interchange design plans to an
<br />FOOT 30% level of completion. The 30% plans developed would then be utilized by various Section
<br />Consultants selected by FOOT to complete the final plans. The interchanges designed included: S.W. 24th
<br />Street. (Coral Way), N.W. 74th Street, 1-75, S.W. 56th Street, S.R. 874, and S.W. 40th Street.
<br />San Juan and Ponce Metropolitan Areas, Puerto Rico - Project consisted of the development of several
<br />major transportation corridor segments in the San Juan and Ponce metropolitan areas. The primal)' scope
<br />of work was to provide preliminal)' engineering plans consisting of roadway and interchange designs,
<br />
<br />SustalnabJllty I Operations & Maintenance I Construction Management I Consulting I Environmental I Architecture & Englneenng I Program Management
<br />
|