My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CSA
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
CSA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2012 5:06:27 PM
Creation date
2/8/2012 5:02:19 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs.
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1 <br /> <br /> <br />1 <br /> <br />1 <br /> <br />'1 <br /> <br />(approx. 0.933 mile). <br />. 2006 - General Engineering Consultant, Miami-Dade Expressway Authority (MDX), Miami-Dade County, FL <br />- Drainage Task Manager for the MDX Improvement Program on SR 924, SR 874, SR 836, SR 836/SR 112 <br />Interconnector and SR 112 Expressways in Miami-Dade County. Responsibilities also include direct <br />involvement in drainage design as well multi-agency coordination for the SR 836/ SR 112/ MIC/ <br />Interconnector. Client: Miami-Dade Expressway Authority. <br /> <br />'1 <br /> <br />F 1 <br /> <br />PD&E STUDIES <br />. 04/2007 -04/2011 - 1-75 (S.R. 93) EMO Study, Miami-Dade/Broward Counties, FL - Responsible for <br />engineering analysis, drainage, interchange analysis/SIMR and utility coordination for Project <br />Development & Environmental (PD&E) Study to plan for future projects to relieve existing and future <br />congestion along the existing 1-75 corridor. The project is approximately 22 miles in length and will include <br />the possible addition of reversible/special purpose use and auxiliary lanes, interchange improvements <br />and a dedicated transitway adjacent to the highway. Client: The Corradino Group. Contact Person: Mike <br />Ciscar (305) 594-0701. <br /> <br />f 1 <br />I f 1 <br />I . J <br />I <br />, I <br />LI <br /> <br />, 1 <br />, J <br /> <br />PORTS <br />. Port of Miami Tunnel & Access Improvements, Miami, Florida - In charge of five Drainage reviews for FDOT <br />District VI of the Conceptual Drainage Report for the performed by Parsons Brinckerhoff. Responsibilities <br />includes drainage reviews of drainage reports and plans as well as coordination with FDOT, consultants <br />and regulatory agencies. <br />. 1997 - Port of Miami, Miami, Florida - Storm drainage design, paving and grading at Terminal 8 & 9 <br />(Carnival Cruise lines) drainage design, paving and grading at the southslip section. <br />. Port of Miami, Miami, Florida - Storm drainage design, paving and grading at the South Slip section. <br />. Port of Miami, Miami, FL - Miscellaneous roadways and drainage projects performed for Bermello, Ajamil <br />and Partners between 1994-1998 <br />. Miami International Airport, Miami-Dade County, FL - Preliminary drainage evaluation, grading and <br />general plan preparation for the Concourse H-J. <br /> <br />r 1 <br /> <br />I , I <br /> <br />r I <br />I <br /> <br />SITE DEVELOPMENT <br />. Miccosukee Indian Resort, Miami-Dade County, Florida - Drainage design. <br />. Renaissance-on-the-Ocean, Broward County, FL - Drainage design. <br />. Bell South Hollywood Main Facility Parking Lot, Florida - Drainage design and permits. <br /> <br />, J <br /> <br />, I <br />I <br /> <br />, j <br /> <br />~t..~. <br />...... <br /> <br />CSA Group <br /> <br />Sustainability I Operations & Maintenance I Construction Management I Consulting I Environmental I Architecture & Engineering I Program Management <br />
The URL can be used to link to this page
Your browser does not support the video tag.