Laserfiche WebLink
<br />1 <br />1 <br />1 <br />1 <br />~ 1 <br />: 1 <br />: 1 <br />~ ) <br />I 1 <br />. J <br />: ] <br />: ] <br />r 1 <br />l J <br />, I <br />, J <br />, I <br />l J <br />l I <br />I <br />l I <br />I <br />I <br />l J <br /> ..t.... <br /> ...... <br /> CSA Group <br /> <br /> <br />OTHER RELATED EXPERIENCE: <br />. 2008-Present: City of Miami Civil Engineering Services for Roadway Projects, Miami-Dade County, FL - <br />Project Manager for Civil Engineering services to include complete planning, design, programming, pavement <br />analysis, surveying, geotechnical, options evaluations, public meetings, detailed assessments and <br />recommendations, cost estimation, opinions of probable construction costs, quality control reviews, field <br />investigations, observations, post design services, construction administration and other related services as <br />need to complete projects. Projects include roadway reconstruction or resurfacing, drainage improvements, <br />swale restoration, curbs, gutters, sidewalks, lighting improvements, landscaping, signage and striping, <br />verification of City's pavement analysis report within project area, surveying, geotechnical and utility <br />locations. Client: City of Miami Capital Improvements, Contact Person: Gary Fabrikant, (305) 416-1224. <br />. 2004-2006: City of Miami General Engineering Consultant, Miami-Dade County, Fl - Project Manager <br />assisting the City of Miami with a city-wide range of engineering services to complete the production of numerous <br />projects. Miami Intemational Airport, Miami-Dade County, Fl Project consisted of preparing plans for the cargo <br />area and west side road improvements. Also included were portions of N.W. 25th Street and N.W. 67th Avenue. <br />Client: City of Miami Capital Improvements, Contact Person: David Mendez, (305) 416-1240. <br />. 2006-2009: Districtwide Miscellaneous PE Design, Miami-Dade County, Fl - Project Manager to assist the <br />Department in preparing a set of contract plans to be used by a selected contractor including project <br />elements for roadway, signing and pavement markings, signalization, lighting, landscaping and right-of-way <br />services for the Department. Services included design, drainage analysis, design and right-of-way surveys, <br />environmental services, field investigations, geotechnical, utility adjustment plans, signalization, structural, <br />lighting and landscape plans for roadways, structures, minor bridge design, intersections, and interchanges. <br />Client: Florida Department ofTransportation, Contact Person: Ana Arvelo, P.E, (305) 470-5210. <br />. S.W. 107th Avenue, Miami-Dade County, FL - Project Manager for roadway design project consisting of <br />milling and resurfacing of existing pavement, drainage design, lighting, signalization, surveying, utility <br />coordination, landscaping and public coordination. The project also includes improvements associated <br />with ADA requirements. <br />. S.W. 57th Avenue from Coral Way to Tamiami Trail, Miami-Dade County, FL - Project Manager for milling <br />and resurfacing the project limits from SW 8th Street to SW 24th Street including drainage analysis and <br />improvements. Intersection at SW 8th Street & SW 24th Street improved to increase capacity. Services <br />included: roadway design and right-of-way surveys, field investigations, utility adjustment plans, <br />signalization, lighting, landscape plans, and sidewalk upgrades. <br />. Mile Marker 30 Scramble Lanes (Big Pine Key), Monroe County, FL - Project Manager for milling and <br />resurfacing project including the addition of a paved median or two-way left turn lane to the existing two- <br />lane and three-lane undivided roadway sections of SR 5 (US 1) / Overseas Highway. Approximately one <br />mile of improvements begin just south of the intersection of Ships Way and extend north to Key Deer Blvd. <br />. 2005-2007: City of Sweetwater Improvements, Miami-Dade County, FL - Project Manager assisting the <br />Department with improvements to the street system of the City of Sweetwater including milling and <br />resurfacing, sidewalk replacement and ADA compliance. Design services includes Roadway design, <br />drainage, signing and pavement markings, signalization, lighting, landscaping and right-of-way. Client: <br />Florida Department of Transportation, Contact Person: Ana Arvelo, P.E, (305) 470-5210. <br />. 2004-2006: FEMA-DORM Drainage - Miami, Florida. Project Manager assisting the Miami-Dade County <br />Department of Environmental Resources Management (DERM) with the management of a $380M program <br />for the replacement and upgrade of roadways and drainage systems at over 3,000 sites damaged during <br />Hurricane Irene and the No-name Storm. The repairs ranged from simple roadway resurfacing to full <br />roadway reconstruction and drainage improvements. Client: Miami-Dade Department of Environmental <br />Resource Management, Contact Person: Eduardo Vega, P.E, (786) 552-8571. <br />. 1998-2000: Districtwide Minor Design, FDOT District Four - Project Manager assisting the Department in <br />preparing a set of contract plans to be used by a selected contractor that included project elements for <br />roadway, signing and pavement markings, signalization, lighting, landscaping and right-of-way services for <br />the Department. Services included design, drainage analysis, design and right-of-way survey <br /> <br />L J <br /> <br />Sustalnablllty I Operations & Maintenance I Construction Management I Consulting I Environmental I Architecture & Engineering I Program Management <br />