Laserfiche WebLink
1 <br /> <br /> <br />1 <br /> <br />1 <br /> <br />I : I <br /> <br />I I t <br />I < J <br /> <br />. <br /> <br />mapping, geotechnical, landscape architecture, bridge design, lighting, signalization and traffic <br />engineering. Client: FDOT District Six, Contact Person: Ana Arvelo, P.E, (305) 470-5210. <br />2004-0ngoing - North Roosevelt Boulevard (S.R. A-I-A), Monroe County, FL - Project includes the <br />reconstruction of 2.5 miles of an urban roadway in Key West. Other improvements include drainage, <br />signing and pavement marking, lighting, signalization, maintenance of traffic and sea wall reconstruction. <br />Client: FOOT District Six, Contact Person: Ali Toghiani, (305) 470-5343. <br />2008-2011- Venetian Causeway, Miami-Dade County, FL - Venetian Causeway, Miami-Dade County, FL- <br />Maintenance of traffic for complete replacement of eleven (11) bridges and a partial replacement of one <br />(1) bridge. Scope will include approach roadway, drainage, surveying, maintenance of traffic, utility <br />adjustments, geotechnical, aerial photogrammetry, lighting, permits, cost estimates, architectural details <br />and all necessary incidental items. Client: Triangle Associates, Inc., Contact Person: Osiris Quintana, P.E., <br />(305) 817-8443. <br />2006-2009 - S.R. 5 (US-l) Yamato Road, Palm Beach County, Florida - Developed maintenance oftraffic <br />plans for 3R Milling and resurfacing project located on S.R. 5/ U.S. 1 just south ofYamato Road to the C- <br />15 Canal. This project includes the analysis of existing roadway conditions to extend the service life of the <br />existing roadway, roadway slopes, geometry, clear zone, and strain pOles and appropriate implemental <br />and analyses. Services also include roadway design, drainage, signalization, maintenance of traffic, <br />signing and pavement markings, utility coordination, surveying, landscaping, geotechnical, <br />photogrammetry, and public involvement. Client: FDOT District Four, Contact Person: Leslie Wetherell, <br />P.E., (954) 777-4438. <br />2005-2008 - S.W.157th Avenue from SW 136th Street to SW 120th Street, Miami, Miami-Dade County, <br />FL - Developed Traffic Control Plans for new roadway construction and existing intersection improvement. <br />Client: Miami-Dade County Public Works Department. Contact Name: Raul Quintela, P.E., (305) 375- <br />3971. <br />2003-2008 - S.R. 820 Hollywood Boulevard, Broward County, FL - Project includes RRR and safety <br />upgrades of 1.2 mile major arterial. Developed traffic control plans for project which included drainage, <br />curb and gutter replacement and milling/resurfacing. Client: FOOT, Contact Name: James Scully, P.E, <br />(954) 777-4633. <br />2005 - S.R. 78 Reconstruction Project in Lee County, FL - Conducted TCP QA Field Review for widening <br />from two to four lanes from east of Slater Road to west of 1-75. Client: Consul-Tech Construction <br />Management, Inc., Contact Name: Carlos Mallol, (954) 438-4300. <br /> <br />~l <br /> <br />~l <br /> <br />~ J <br /> <br />~ ] <br /> <br />~ J <br /> <br />. I <br />< J <br /> <br />, 1 <br />I <br /> <br />. J <br /> <br />~t.~. <br />..~... <br /> <br />CSA Group <br /> <br />FREEWAY & INTERCHANGE <br />2007 -2010 -1-95 (S.R. 9A) Managed Lanes, Miami-Dade County, FL (TPDA 210,000) - Developed Traffic <br />Control Plans for 11 mile section of urban interstate to convert north and south bound lanes to managed <br />variable price toll lanes. Work consisted of multiple lane closures, shifts and major detours for full closures <br />of 1-95 and SR 112 to construct bridge widening and jacking, and installation of overhead sign and gantry <br />structures. Client: Corzo, Carballo, Castello, Thompson & Salman, P.A. Contact Person: Walfrido Pevida, <br />P.E., (305) 445-2900. <br />· 2004-2007 - MDX S.R. 874 Killian Parkway, Miami-Dade County, FL (TPDA 120,000) - Currently under <br />design, widening and reconstruction and preparation of the maintenance of traffic plans of the Don Shula <br />Expressway (S.R. 874) approximately 3.1 miles in length from north of S.W. 117th Avenue to the south of <br />s.w. 88th Street (Kendall Drive). Includes the modification to the Killian Parkway Interchange and the <br />construction of a new northbound and southbound mainline toll plazas and a northbound ramp plaza to <br />the exit to Killian Parkway. Client: Miami-Dade County Expressway Authority. Contact Name: Alfredo <br />Lurigados, P.E., (305) 637 -3277. <br />· 2004-2007 - MDX S.R. 874 Northbound On-Ramps, Miami-Dade County, FL (TPDA 120,000) - Developed <br />Traffic control plans for 1. 73 mile project consisting of new ramp connector between expressways, bridge <br />construction and existing ramp relocation. Client: C3TS, Contact Name: Wilfredo Pevida, (305) 445-2900. <br />· 2005-Present - MDX S.R. 87 4 Interim Toll Plaza Improvements, Miami-Dade County, FL (TPDA 120,000) _ <br />Developed traffic control plans for existing plaza redesign to include Sunpass lane widening. Client: <br />Miami-Dade County Expressway Authority. Contact Name: Alfredo Lurigados, P.E., (305) 637-3277. <br /> <br />, I <br /> <br />l ! <br /> <br />, I <br /> <br />< 1 <br /> <br />I <br />l J <br /> <br />l J <br /> <br />, J <br /> <br />, J <br /> <br />l j <br /> <br />Sustalnability I Operations & Maintenance I Construction Management I Consulting I Environmental I Architecture & Engineering I Program Management <br />