<br />Drainage analysis and improvements will also be included within the same limits. Intersection
<br />improvement at SW 8th Street & SW 24th Street will also be improved to increase capacity. Services
<br />also include: roadway design and right-of-way surveys, field investigations, utility adjustment plans,
<br />signalization, lighting, landscape plans, and sidewalk upgrades.
<br />o Mile Marker 30 Scramble Lanes (Big Pine Key), Monroe County, FL - Project Manager for milling and
<br />resurfacing project including the addition of a paved median or two-way left tum lane to the existing
<br />two-lane and three-lane undivided roadway sections of SR 5 (US 1) / Overseas Highway. The limits of
<br />the improvements begin just south of the intersection of Ships Way and extend north to Key Deer Blvd.
<br />(approx. 0.933 mile).
<br />· 2005-2007 - City of Sweetwater Improvements, Miami-Dade County, FL - Project Manager to assist the
<br />Department with improvements to the street system of the City of Sweetwater including milling and
<br />resurfacing, sidewalk replacement and ADA compliance. Design services include Roadway design,
<br />drainage, signing and pavement markings, signalization, lighting, landscaping and right-of-way. Client:
<br />FDOT District Six. Contact Person: Ana Arvelo, P.E, (305) 470-5210.
<br />2004-2006 - FEMA-DORM Drainage - Miami, Florida. Project Manager to assist to Miami-Dade County
<br />Department of Environmental Resources Management (DERM) with the management of a $380 Million
<br />program for the replacement and upgrade of roadways and drainage systems at over 3,000 sites damaged
<br />during Hurricane Irene and the No-name Storm. The repairs ranged from simple roadway resurfacing to full
<br />roadway reconstruction and drainage improvements. Client: Miami-Dade Department of Environmental
<br />Resource Management, Contact Person: Eduardo Vega, P.E, (786) 552-8571.
<br />2004-2006 - City of Miami General Engineering Consultant, Miami-Dade County, FL - Project Manager to
<br />assist the City of Miami with a city-wide range of engineering services in bringing to completion the
<br />production of numerous projects. Client: City of Miami Capital Improvements. Contact Person: David
<br />Mendez, (305) 416-1240.
<br />· 1994-2004 - Position/Title - Palmetto Improvement Program (SR 826), Miami-Dade County, FL (TPDA
<br />190,000) - Reviewed and coordinated Maintenance of Traffic design plans for interchanges at SW 24th
<br />Street, NW 36th Street, NW 58th Street, NW 74th Street, Okeechobee Road and NW 103rd Street.
<br />
<br />~l
<br />
<br />~ I
<br />
<br />~l
<br />
<br />: ]
<br />
<br />: I
<br />
<br />r ,
<br />, J
<br />
<br />, I
<br />I ,i
<br />
<br />l J
<br />
<br />CONSTRUCTION ENGINEERING PROJECTS
<br />S.R.25, Okeechobee Road, Miami-Dade County FL - Project included widening and reconstruction of
<br />existing two lane section and new construction of proposed north bound roadway. Improvements including
<br />demucking, embankment, drainage and median construction from SR 826 to North of NW 87th Avenue.
<br />S.R. 826/NW 122nd Street Interchange, Miami-Dade County, FL - Project consisted of construction of
<br />grade separation interchange, widening of SR 826 and NW 122nd Street. Project also involved bridge
<br />construction, canal relocation and ramp and frontage road construction.
<br />S.R. 9, NW 27th Avenue, Miami-Dade County, FL - Project included major reconstruction and widening of
<br />urban section from NW 103rd Street to NW 135th Street. Project included bridge widening.
<br />S.R. 948, NW 36 Street, Miami-Dade County, FL - Project included widening, reconstruction from 4 to 6
<br />lanes. Improvements included drainage, curb gutter and sidewalk, lighting and signalization from NW 57th
<br />Avenue to NW 12th Avenue.
<br />· S.R. 836, Miami-Dade County, FL - Project consisted of new construction of limited access facility
<br />including canal relocation and bridge construction from NW 30th Avenue to NW 42nd Avenue.
<br />
<br />, I
<br />I
<br />I
<br />I I
<br />
<br />, I
<br />I ,1
<br />
<br />r I
<br />I
<br />
<br />, J
<br />
<br />, J
<br />
<br />, )
<br />
<br />.........
<br />..~...
<br />
<br />CSA Group
<br />
<br />, ,
<br />
<br />I ,J
<br />
<br />Sustainablllty I Operations & Maintenance I Construction Management I Consulting I EnVironmental I Architecture & Engineering I Program Management
<br />
|