Laserfiche WebLink
<br />1 <br /> <br /> <br />1 <br /> <br />1 <br /> <br />~ 1 <br /> <br />Drainage analysis and improvements will also be included within the same limits. Intersection <br />improvement at SW 8th Street & SW 24th Street will also be improved to increase capacity. Services <br />also include: roadway design and right-of-way surveys, field investigations, utility adjustment plans, <br />signalization, lighting, landscape plans, and sidewalk upgrades. <br />o Mile Marker 30 Scramble Lanes (Big Pine Key), Monroe County, FL - Project Manager for milling and <br />resurfacing project including the addition of a paved median or two-way left tum lane to the existing <br />two-lane and three-lane undivided roadway sections of SR 5 (US 1) / Overseas Highway. The limits of <br />the improvements begin just south of the intersection of Ships Way and extend north to Key Deer Blvd. <br />(approx. 0.933 mile). <br />· 2005-2007 - City of Sweetwater Improvements, Miami-Dade County, FL - Project Manager to assist the <br />Department with improvements to the street system of the City of Sweetwater including milling and <br />resurfacing, sidewalk replacement and ADA compliance. Design services include Roadway design, <br />drainage, signing and pavement markings, signalization, lighting, landscaping and right-of-way. Client: <br />FDOT District Six. Contact Person: Ana Arvelo, P.E, (305) 470-5210. <br />2004-2006 - FEMA-DORM Drainage - Miami, Florida. Project Manager to assist to Miami-Dade County <br />Department of Environmental Resources Management (DERM) with the management of a $380 Million <br />program for the replacement and upgrade of roadways and drainage systems at over 3,000 sites damaged <br />during Hurricane Irene and the No-name Storm. The repairs ranged from simple roadway resurfacing to full <br />roadway reconstruction and drainage improvements. Client: Miami-Dade Department of Environmental <br />Resource Management, Contact Person: Eduardo Vega, P.E, (786) 552-8571. <br />2004-2006 - City of Miami General Engineering Consultant, Miami-Dade County, FL - Project Manager to <br />assist the City of Miami with a city-wide range of engineering services in bringing to completion the <br />production of numerous projects. Client: City of Miami Capital Improvements. Contact Person: David <br />Mendez, (305) 416-1240. <br />· 1994-2004 - Position/Title - Palmetto Improvement Program (SR 826), Miami-Dade County, FL (TPDA <br />190,000) - Reviewed and coordinated Maintenance of Traffic design plans for interchanges at SW 24th <br />Street, NW 36th Street, NW 58th Street, NW 74th Street, Okeechobee Road and NW 103rd Street. <br /> <br />~l <br /> <br />~ I <br /> <br />~l <br /> <br />: ] <br /> <br />: I <br /> <br />r , <br />, J <br /> <br />, I <br />I ,i <br /> <br />l J <br /> <br />CONSTRUCTION ENGINEERING PROJECTS <br />S.R.25, Okeechobee Road, Miami-Dade County FL - Project included widening and reconstruction of <br />existing two lane section and new construction of proposed north bound roadway. Improvements including <br />demucking, embankment, drainage and median construction from SR 826 to North of NW 87th Avenue. <br />S.R. 826/NW 122nd Street Interchange, Miami-Dade County, FL - Project consisted of construction of <br />grade separation interchange, widening of SR 826 and NW 122nd Street. Project also involved bridge <br />construction, canal relocation and ramp and frontage road construction. <br />S.R. 9, NW 27th Avenue, Miami-Dade County, FL - Project included major reconstruction and widening of <br />urban section from NW 103rd Street to NW 135th Street. Project included bridge widening. <br />S.R. 948, NW 36 Street, Miami-Dade County, FL - Project included widening, reconstruction from 4 to 6 <br />lanes. Improvements included drainage, curb gutter and sidewalk, lighting and signalization from NW 57th <br />Avenue to NW 12th Avenue. <br />· S.R. 836, Miami-Dade County, FL - Project consisted of new construction of limited access facility <br />including canal relocation and bridge construction from NW 30th Avenue to NW 42nd Avenue. <br /> <br />, I <br />I <br />I <br />I I <br /> <br />, I <br />I ,1 <br /> <br />r I <br />I <br /> <br />, J <br /> <br />, J <br /> <br />, ) <br /> <br />......... <br />..~... <br /> <br />CSA Group <br /> <br />, , <br /> <br />I ,J <br /> <br />Sustainablllty I Operations & Maintenance I Construction Management I Consulting I EnVironmental I Architecture & Engineering I Program Management <br />