|
<br />
<br /> 1
<br /> 1
<br /> l
<br /> PROFESSIONAL LICENSES
<br /> rI AND REGISTRATIONS
<br /> Engineer Intern, Florida No.
<br /> 1100014581,7/2/10
<br /> ~ 1 EDUCATION
<br /> B.S. Civil Engineering, Florida
<br /> International University, May
<br /> r 1 2009
<br /> AFFILIATIONS
<br /> ~ 1 American Society of Civil
<br /> Engineers, Treasurer
<br /> Chi Epsilon Honor Society,
<br /> Dean's List
<br /> ~ ] TRAINING
<br />I Florida Advanced Work Zone,
<br />j ~ I Exp.4/9/2014
<br />FOOT 2008 Geopak I
<br />I FDOT 2008 Geopak Cross
<br />, I Sections
<br /> l J
<br /> YEARS EXPERIENCE
<br />I r I 5
<br /> , J
<br /> , I
<br /> l I
<br /> r I
<br /> l 1
<br />
<br />I
<br />, J
<br />
<br />, j
<br />
<br />l. j
<br />
<br />_ J
<br />
<br />~t.~.
<br />......
<br />
<br />CSA Group
<br />
<br />, j
<br />
<br />, I
<br />
<br />TECHNICAL EXPERTISE
<br />Ms. Garganta has over 5 years of experience in the production of major arterials, freeway and interchanges,
<br />traffic control master plans and plans production, drainage plan, land development and landscape plans
<br />utilizing MicroStation and Geopak.
<br />
<br />RELEVANT EXPERIENCE
<br />1. Consul-Tech Enterprises, Inc
<br />. 2009 - Present: Design Engineer - Responsibilities include the design of roadway projects including
<br />horizontal design and vertical alignment design, traffic control plans, signing and pavement marking,
<br />drainage design and plans production.
<br />. 2006 - 2009: CADD Technician - Responsible for the design of roadway, civil and survey plans utilizing on
<br />MicroStation, and GeoPak platform utilizing Electronic Delivery.
<br />
<br />PARTIAL LIST OF PROJECTS
<br />
<br />PD&E STUDIES
<br />. 2007-Present -1-95 & S.R. 9 PD&E Study from North of Oakland Park Boulevard to South of Glades Road
<br />Improvements, Broward County/Palm Beach County, Fl - CADD Technician for Project Development and
<br />Environment (PD&E) Study for interstate improvements including additional lanes, inte~phange
<br />modifications, bridge replacement, and bridge widening as contained in the MPO-Adopted 1-95/1-595
<br />Master Plan locally Preferred Alternative (lPA) to widened 1-95 to increase the mainline width to 10 lanes
<br />with 8 general purpose lanes, 2 HOV lanes, interchange improvements. Client: The Corradino Group, Inc.
<br />Contact: Mike Ciscar, (305) 594-0701.
<br />. 2007 -2008 - 1-75 EMO Study, Miami-Dade/Broward Counties, Fl - Roadway and Drainage Design of
<br />Project Development & Environmental (PD&E) Study to plan for future projects to relieve existing and
<br />future congestion along the existing 1-75 corridor. The project is located in northwestern Miami-Dade
<br />County and southwestern Broward and is approximately 22 miles in length. The improvements will include
<br />the possible addition of reversible/special purpose use and auxiliary lanes, interchange improvements
<br />and a dedicated transitway adjacent to the highway. These improvements will address future growth and
<br />development projected in the region, enhance hurricane and other emergency evacuation, and improve
<br />system connectivity between 1-75, S.R. 826 (Palmetto Expressway), Gratigny Parkway, Florida's Turnpike, 1-
<br />595 and the Sawgrass Expressway. Responsibilities include engineering analysis, drainage, interchange
<br />analysis/SIMR and utility coordination. Client: The Corradino Group, Mike Ciscar, P.E., (305) 594-0701.
<br />
<br />MAJOR ARTERIAL PROJECTS
<br />. 2010 - Present - S.R. 90/S.W. 8th Street from S.R. 821 (HEFT) to S.R. 826 (Palmetto Expressway), Miami-
<br />Dade County, Fl - Roadway design for milling and resurfacing project that includes safety improvements,
<br />ADA upgrades, and additional safety upgrades at the intersections of S.W. 92nd Avenue, S.W. 102nd
<br />Avenue to S.W. 99th Place, and S.W. 109th Avenue. Furthermore, upgrades to include provisions for Turbo
<br />lanes at the intersection of S.W. 102nd Avenue will be made. Design elements include roadway design,
<br />signing & pavement markings, drainage, maintenance of traffic, surveying and mapping, geotechnical,
<br />landscape architecture, bridge design, lighting, signalization and traffic engineering. Client: FOOT District
<br />Six, Contact Person: Ana Arvelo, P.E, (305) 470-5210.
<br />. 2008 - 2011- Venetian Causeway, Miami-Dade County, Fl- Roadway and Drainage Design for complete
<br />replacement of eleven (11) bridges and a partial replacement of one (1) bridge. Scope will include
<br />approach roadway, drainage, surveying, maintenance of traffic, utility adjustments, geotechnical, aerial
<br />photogrammetry, lighting, permits, cost estimates, architectural details and all necessary incidental items.
<br />Client: Triangle Associates, Inc., Contact Person: Osiris Quintana, P.E., (305) 817-8443.
<br />
<br />Sustalnability I Operations & Maintenance I Construction Management I Consulting I Environmental I Architecture & Engineering I Program Management
<br />
|