Laserfiche WebLink
<br /> <br /> 1 <br /> 1 <br /> l <br /> PROFESSIONAL LICENSES <br /> rI AND REGISTRATIONS <br /> Engineer Intern, Florida No. <br /> 1100014581,7/2/10 <br /> ~ 1 EDUCATION <br /> B.S. Civil Engineering, Florida <br /> International University, May <br /> r 1 2009 <br /> AFFILIATIONS <br /> ~ 1 American Society of Civil <br /> Engineers, Treasurer <br /> Chi Epsilon Honor Society, <br /> Dean's List <br /> ~ ] TRAINING <br />I Florida Advanced Work Zone, <br />j ~ I Exp.4/9/2014 <br />FOOT 2008 Geopak I <br />I FDOT 2008 Geopak Cross <br />, I Sections <br /> l J <br /> YEARS EXPERIENCE <br />I r I 5 <br /> , J <br /> , I <br /> l I <br /> r I <br /> l 1 <br /> <br />I <br />, J <br /> <br />, j <br /> <br />l. j <br /> <br />_ J <br /> <br />~t.~. <br />...... <br /> <br />CSA Group <br /> <br />, j <br /> <br />, I <br /> <br />TECHNICAL EXPERTISE <br />Ms. Garganta has over 5 years of experience in the production of major arterials, freeway and interchanges, <br />traffic control master plans and plans production, drainage plan, land development and landscape plans <br />utilizing MicroStation and Geopak. <br /> <br />RELEVANT EXPERIENCE <br />1. Consul-Tech Enterprises, Inc <br />. 2009 - Present: Design Engineer - Responsibilities include the design of roadway projects including <br />horizontal design and vertical alignment design, traffic control plans, signing and pavement marking, <br />drainage design and plans production. <br />. 2006 - 2009: CADD Technician - Responsible for the design of roadway, civil and survey plans utilizing on <br />MicroStation, and GeoPak platform utilizing Electronic Delivery. <br /> <br />PARTIAL LIST OF PROJECTS <br /> <br />PD&E STUDIES <br />. 2007-Present -1-95 & S.R. 9 PD&E Study from North of Oakland Park Boulevard to South of Glades Road <br />Improvements, Broward County/Palm Beach County, Fl - CADD Technician for Project Development and <br />Environment (PD&E) Study for interstate improvements including additional lanes, inte~phange <br />modifications, bridge replacement, and bridge widening as contained in the MPO-Adopted 1-95/1-595 <br />Master Plan locally Preferred Alternative (lPA) to widened 1-95 to increase the mainline width to 10 lanes <br />with 8 general purpose lanes, 2 HOV lanes, interchange improvements. Client: The Corradino Group, Inc. <br />Contact: Mike Ciscar, (305) 594-0701. <br />. 2007 -2008 - 1-75 EMO Study, Miami-Dade/Broward Counties, Fl - Roadway and Drainage Design of <br />Project Development & Environmental (PD&E) Study to plan for future projects to relieve existing and <br />future congestion along the existing 1-75 corridor. The project is located in northwestern Miami-Dade <br />County and southwestern Broward and is approximately 22 miles in length. The improvements will include <br />the possible addition of reversible/special purpose use and auxiliary lanes, interchange improvements <br />and a dedicated transitway adjacent to the highway. These improvements will address future growth and <br />development projected in the region, enhance hurricane and other emergency evacuation, and improve <br />system connectivity between 1-75, S.R. 826 (Palmetto Expressway), Gratigny Parkway, Florida's Turnpike, 1- <br />595 and the Sawgrass Expressway. Responsibilities include engineering analysis, drainage, interchange <br />analysis/SIMR and utility coordination. Client: The Corradino Group, Mike Ciscar, P.E., (305) 594-0701. <br /> <br />MAJOR ARTERIAL PROJECTS <br />. 2010 - Present - S.R. 90/S.W. 8th Street from S.R. 821 (HEFT) to S.R. 826 (Palmetto Expressway), Miami- <br />Dade County, Fl - Roadway design for milling and resurfacing project that includes safety improvements, <br />ADA upgrades, and additional safety upgrades at the intersections of S.W. 92nd Avenue, S.W. 102nd <br />Avenue to S.W. 99th Place, and S.W. 109th Avenue. Furthermore, upgrades to include provisions for Turbo <br />lanes at the intersection of S.W. 102nd Avenue will be made. Design elements include roadway design, <br />signing & pavement markings, drainage, maintenance of traffic, surveying and mapping, geotechnical, <br />landscape architecture, bridge design, lighting, signalization and traffic engineering. Client: FOOT District <br />Six, Contact Person: Ana Arvelo, P.E, (305) 470-5210. <br />. 2008 - 2011- Venetian Causeway, Miami-Dade County, Fl- Roadway and Drainage Design for complete <br />replacement of eleven (11) bridges and a partial replacement of one (1) bridge. Scope will include <br />approach roadway, drainage, surveying, maintenance of traffic, utility adjustments, geotechnical, aerial <br />photogrammetry, lighting, permits, cost estimates, architectural details and all necessary incidental items. <br />Client: Triangle Associates, Inc., Contact Person: Osiris Quintana, P.E., (305) 817-8443. <br /> <br />Sustalnability I Operations & Maintenance I Construction Management I Consulting I Environmental I Architecture & Engineering I Program Management <br />