|
<br />1
<br />
<br />
<br />1
<br />
<br />1
<br />
<br />r I
<br />
<br />· 2008-2010 - N.w. 138th Street @ 1-75 Interchange, Miami-Dade County, FL - Roadway design of a 2
<br />lane-2 way suburban arterial in coordinating the design with the City of Hialeah to upgrade facilities to
<br />three lanes in each direction. Client: Florida Department of Transportation Contact Person: Ana Arvelo,
<br />P.E., (305) 470-5210.
<br />. 2008-0ngoing - S.W. 57 Avenue from Coral Way to Tamiami Trail, Miami-Dade County, FL - Roadway and
<br />Drainage Design of milling and resurfacing the project limits from SW 8th Street to SW 24th Street.
<br />Drainage analysis and improvements will also be included within the same limits. Intersection
<br />improvement at SW 8th Street & SW 24th Street will also be improved to increase capacity. Services also
<br />include: roadway design and right-of-way surveys, field investigations, utility adjustment plans,
<br />signalization, lighting, landscape plans, and sidewalk upgrades. This project is part of the DW
<br />Miscellaneous Professional Design Consultant Contract that Consul-Tech has with FDOT District 6 to
<br />perform engineering services and developing construction documents to be used by a selected contractor.
<br />Client: FDOT District Six, Contact Person: Ana Arvelo, P.E. (305) 470-5100.
<br />. 2005-2008 - S.W. 157 from SW 136 Street to SW 120 Street, Miami-Dade County Public Works Dept.,
<br />Miami-Dade County, FL - CADD Technician for management of the project and roadway design. Client:
<br />Miami-Dade County Public Works Department Contact Person: Raul Quintela, P.E., (305) 375-3971.
<br />. 2006-2008 - S.R. AlA (Ocean Drive), Broward County, FL - CADD Technician for 3R Milling and
<br />resurfacing project located on SR AlA from south of Seacrest Parkway (MP 0.870) to Azalea Terrace (MP
<br />2.011). Services include roadway design, drainage, signalization, maintenance of traffic, signing and
<br />pavement markings, utility coordination, surveying, landscaping, geotechnical, photogrammetry, and
<br />public involvement.. This project includes the analysis of existing roadway conditions to extend the service
<br />life of the existing roadway, roadway slopes, geometry, clear zone, and strain poles and appropriate
<br />implemental and analyses. Plans were submitted in FDOT's Electronic Delivery System. Client: FDOT
<br />District Four, Contact Person: Bing Wang, P.E. (954) 777-4406.
<br />. 2006-Present - North Roosevelt Boulevard (S.R. A-l-A), Monroe County, FL - Roadway design the
<br />reconstruction of 2.5 miles of an urban roadway in Key West. Other improvements include drainage,
<br />signing and pavement marking, lighting, signalization, and sea wall reconstruction. Client: FDOT District
<br />Six, Contact Person: AIi Toghiani, (305) 470-5343.
<br />
<br />fl
<br />
<br />r 1
<br />
<br />c I
<br />! : I
<br />I
<br />I
<br />I ~ I
<br />I
<br />I
<br />
<br />, I
<br />
<br />, I
<br />
<br />~ )
<br />
<br />, I
<br />
<br />FREEWAY AND INTERCHANGE PROJECTS
<br />. 2007-2010 - 1-95 Managed Lanes, Miami-Dade County, FL - CADD Technician for the development of
<br />Traffic control plans for the Construction of northbound overhead gantries and restriping of northbound
<br />lanes from SR 112 to Golden Glades Interchange. Client: Corzo, Carballo, Castello, Thompson & Salman,
<br />P.A. Contact Person: Walfrido Pevida, P.E., (305) 445-2900.
<br />. 1996-2008 - S.R. 826 (Palmetto Expressway) Interchanges at Miller Drive, S.R. 874 and Bird Road,
<br />Miami-Dade County, FL - CADD Technician for final design includes approximately 2.2 miles of limited
<br />access mainline reconstruction, three interchange reconstructions, and reconstruction of crossroads. One
<br />of the interchange designs will consist of a single point interchange. This interchange will be the only one
<br />of its kind in Miami-Dade County when constructed. The project includes 11 bridge structures. Plans were
<br />submitted in FDOT's Electronic Delivery System. Client: FDOT District Six, Contact Person: Jason Chang,
<br />P.E., (305) 470-5331.
<br />. 2006-2007 - SR 874 Killian Parkway, Miami-Dade County, FL - CADD Technician for the reconstruction of
<br />a six lane to eight lane limited access toll plaza facility. The project includes two new mainline toll plazas,
<br />a ramp toll plaza, and the demolition of an existing plaza. The new plaza provides for open road. The
<br />project also includes improvement to Killian Parkway Interchange. Client: Miami-Dade Expressway
<br />Authority Contact Person: Alfred Lurigados, P.E. (305) 637-3277.
<br />. 2006-2007 - SR 874 Killian Parkway Northbound On-Ramp, Miami-Dade County, FL - CADD Technician
<br />for the construction of a new ramp connection from North Kendall Drive to SR 874 and SR 878 in Miami-
<br />Dade County. The improvements include modifications to the existing ramp and reconstruction of a new
<br />
<br />~+:..~.
<br />......
<br />
<br />CSA Group
<br />
<br />, J
<br />
<br />Sustainabllity I Operations & Maintenance I Construction Management I Consulting I Environmental I Architecture & Engineering I Program Management
<br />
|