|
<br />1
<br />
<br />
<br />1
<br />
<br />1
<br />
<br />~ I
<br />
<br />. 2007 -Present: SR AlA (Ocean Drive),Hallandale Beach, Florida, Broward County, FL. Design Engineer to
<br />assist to FDOT District 4 with RRR milling and resurfacing of SR AlA from South of Seacrest Parkway to
<br />Azalea Terrace. Services include roadway design, drainage, signalization, maintenance of traffic, signing
<br />and pavement markings, utility coordination, surveying, landscaping, geotechnical, photogrammetry, and
<br />public involvement. A "Ride Only" scope was added the contract. Client: Florida Department of
<br />Transportation District Four, Contact Person: Bing Wang, P.E., (954) 777 -4406.
<br />. 2007-2008 - SR 826 (Palmetto Expressway) at Bird Road, Miller Drive and SR 874 Interchanges. FDOT
<br />District VI, Miami, Florida. Design Engineer in the preparation of Drainage structure plans and
<br />computation book. Client: Florida Department of Transportation District Six, Contact Person: Jason Chang,
<br />(305) 470-5331.
<br />. 2007 -2008 - S.R 874 Killian Parkway Improvements, Miami-Dade County, FL - Design Engineer in the
<br />preparation of contract plans, review and preparation of drainage reports using the ICPR software, and
<br />preparation of computation book for roadway and open road tolling. Client: Miami-Dade Expressway
<br />Authority Contact Person: Alfred Lurigados, P.E. (305) 637-3277.
<br />
<br />~l
<br />
<br />r I
<br />
<br />, I
<br />
<br />t I
<br />
<br />2. State University of New York, Syracuse, NY
<br />. 2006-2007 - Graduate Research Assistant - Conducted research on the recycling of molybdate, a catalyst
<br />used during the bleaching process of pulp. Research involved the extraction of the molybdate from
<br />bleached paper effluent and investigation into its reuse and also in industrial applications such as the
<br />anaerobic treatment of wastewater and the manufacture of paints.
<br />. 2005-2006 - Teaching Assistant Fluid Mechanics and Computer Methods in Engineering and Physical
<br />Science.
<br />
<br />~ I
<br />
<br />, I
<br />
<br />, J
<br />
<br />3. ABP Consult, Accra, Ghana
<br />. 2004-2005 - Assistant Design & Site Engineer. Performed hydraulic analysis for design of water
<br />distribution and supply system, environmental impact assessment and analysis for sewage system and
<br />construction site supervision.
<br />
<br />, I
<br />
<br />. I
<br />
<br />4. Twum Boafo & Partns, Accra, Ghana
<br />. July 2003-September 2003 - Trainee Engineer - Summer internship responsible for design and
<br />construction engineering services in the supervision of drainage system construction, roadway, bridge
<br />abutments and pier construction.
<br />
<br />, I
<br />
<br />I I
<br />
<br />5. Comptran Engineers and Planning Associates
<br />. July 2002-September 2002 - Trainee Engineer - Summer internship responsible for assisting in the
<br />supervision of construction of classroom blocks and ancillary structures.
<br />
<br />, J
<br />
<br />6. Architectural and Engineering Services, Ltd., Accra, Ghana
<br />. August 2001-September 2001 - Trainee Engineer - Summer internship responsible for topographical
<br />and hydrological surveys of drainage systems in Alajo, Adabraka and other flood prone areas in Accra.
<br />
<br />.........
<br />......
<br />
<br />CSA Group
<br />
<br />PARTIAL LIST OF PROJECTS
<br />PD&E STUDIES
<br />2007 -2008 - 1-75 EMO Study, Miami-DadejBroward Counties, FL - Roadway and Drainage Design of
<br />Project Development & Environmental (PD&E) Study to plan for future projects to relieve existing and
<br />future congestion along the existing 1-75 corridor. The project is located in northwestern Miami-Dade
<br />County and southwestern Broward and is approximately 22 miles in length. The improvements will include
<br />the possible addition of reversiblejspecial purpose use and auxiliary lanes, interchange improvements
<br />and a dedicated transitway adjacent to the highway. These improvements will address future growth and
<br />development projected in the region, enhance hurricane and other emergency evacuation, and improve
<br />system connectivity between 1-75, S.R. 826 (Palmetto Expressway), Gratigny Parkway, Florida's Turnpike, 1-
<br />595 and the Sawgrass Expressway. Responsibilities include engineering analysis, drainage, interchange
<br />analysisjSIMR and utility coordination. Client: The Corradino Group, Mike Ciscar, P.E., (305) 594-0701.
<br />
<br />, }
<br />
<br />, ,
<br />
<br />Sustainability I Operations & Maintenance I Construction Management I Consulting I Environmental I Architecture & Engineering I Program Management
<br />
|