Laserfiche WebLink
<br />1 <br /> <br /> <br />1 <br /> <br />1 <br /> <br />~ I <br /> <br />. 2007 -Present: SR AlA (Ocean Drive),Hallandale Beach, Florida, Broward County, FL. Design Engineer to <br />assist to FDOT District 4 with RRR milling and resurfacing of SR AlA from South of Seacrest Parkway to <br />Azalea Terrace. Services include roadway design, drainage, signalization, maintenance of traffic, signing <br />and pavement markings, utility coordination, surveying, landscaping, geotechnical, photogrammetry, and <br />public involvement. A "Ride Only" scope was added the contract. Client: Florida Department of <br />Transportation District Four, Contact Person: Bing Wang, P.E., (954) 777 -4406. <br />. 2007-2008 - SR 826 (Palmetto Expressway) at Bird Road, Miller Drive and SR 874 Interchanges. FDOT <br />District VI, Miami, Florida. Design Engineer in the preparation of Drainage structure plans and <br />computation book. Client: Florida Department of Transportation District Six, Contact Person: Jason Chang, <br />(305) 470-5331. <br />. 2007 -2008 - S.R 874 Killian Parkway Improvements, Miami-Dade County, FL - Design Engineer in the <br />preparation of contract plans, review and preparation of drainage reports using the ICPR software, and <br />preparation of computation book for roadway and open road tolling. Client: Miami-Dade Expressway <br />Authority Contact Person: Alfred Lurigados, P.E. (305) 637-3277. <br /> <br />~l <br /> <br />r I <br /> <br />, I <br /> <br />t I <br /> <br />2. State University of New York, Syracuse, NY <br />. 2006-2007 - Graduate Research Assistant - Conducted research on the recycling of molybdate, a catalyst <br />used during the bleaching process of pulp. Research involved the extraction of the molybdate from <br />bleached paper effluent and investigation into its reuse and also in industrial applications such as the <br />anaerobic treatment of wastewater and the manufacture of paints. <br />. 2005-2006 - Teaching Assistant Fluid Mechanics and Computer Methods in Engineering and Physical <br />Science. <br /> <br />~ I <br /> <br />, I <br /> <br />, J <br /> <br />3. ABP Consult, Accra, Ghana <br />. 2004-2005 - Assistant Design & Site Engineer. Performed hydraulic analysis for design of water <br />distribution and supply system, environmental impact assessment and analysis for sewage system and <br />construction site supervision. <br /> <br />, I <br /> <br />. I <br /> <br />4. Twum Boafo & Partns, Accra, Ghana <br />. July 2003-September 2003 - Trainee Engineer - Summer internship responsible for design and <br />construction engineering services in the supervision of drainage system construction, roadway, bridge <br />abutments and pier construction. <br /> <br />, I <br /> <br />I I <br /> <br />5. Comptran Engineers and Planning Associates <br />. July 2002-September 2002 - Trainee Engineer - Summer internship responsible for assisting in the <br />supervision of construction of classroom blocks and ancillary structures. <br /> <br />, J <br /> <br />6. Architectural and Engineering Services, Ltd., Accra, Ghana <br />. August 2001-September 2001 - Trainee Engineer - Summer internship responsible for topographical <br />and hydrological surveys of drainage systems in Alajo, Adabraka and other flood prone areas in Accra. <br /> <br />......... <br />...... <br /> <br />CSA Group <br /> <br />PARTIAL LIST OF PROJECTS <br />PD&E STUDIES <br />2007 -2008 - 1-75 EMO Study, Miami-DadejBroward Counties, FL - Roadway and Drainage Design of <br />Project Development & Environmental (PD&E) Study to plan for future projects to relieve existing and <br />future congestion along the existing 1-75 corridor. The project is located in northwestern Miami-Dade <br />County and southwestern Broward and is approximately 22 miles in length. The improvements will include <br />the possible addition of reversiblejspecial purpose use and auxiliary lanes, interchange improvements <br />and a dedicated transitway adjacent to the highway. These improvements will address future growth and <br />development projected in the region, enhance hurricane and other emergency evacuation, and improve <br />system connectivity between 1-75, S.R. 826 (Palmetto Expressway), Gratigny Parkway, Florida's Turnpike, 1- <br />595 and the Sawgrass Expressway. Responsibilities include engineering analysis, drainage, interchange <br />analysisjSIMR and utility coordination. Client: The Corradino Group, Mike Ciscar, P.E., (305) 594-0701. <br /> <br />, } <br /> <br />, , <br /> <br />Sustainability I Operations & Maintenance I Construction Management I Consulting I Environmental I Architecture & Engineering I Program Management <br />