Laserfiche WebLink
<br />~l <br /> <br />rl <br /> <br />~ 1 <br /> <br />r 1 <br /> <br />~ 1 <br /> <br />r I <br /> <br />: I <br /> <br />r I <br />I . I <br /> <br />I "1 <br />I . J <br /> <br />r I <br />I . I <br /> <br />, I <br /> <br />r I <br />, I <br /> <br />. J <br /> <br />. J <br /> <br />'ll ,~ffi.' <br /> <br /> <br />EXPERTISE <br />Utility Coordination <br /> <br />EXPERIENCE <br />6 Years <br /> <br />EMPLOYMENT <br />Joined FRA 7/2011 <br /> <br />Jacobs: 2006 - 2011 <br />C3TS:1996-2006s <br /> <br />EDUCATION <br />B,S,C,E. <br />Florida International <br />University <br />Miami, Florida <br />(1998) <br /> <br />CERTIFICATIONS <br />FUCC- Design, Cost <br />Estimating & Billing, and <br />Coordination Module <br /> <br />American Public Works <br />"Introduction to Damage <br />Prevention and Safety" <br /> <br />FOOT "Advanced Work Zone <br />Traffic Control" <br /> <br />FOEP "Storm Water, Erosion, <br />& Sedimentation Control <br />Inspector" <br /> <br />Member of APWA since 1998 <br />Member of ASCE since 1998 <br /> <br />Former Chairperson for the <br />"Miami-Dade County Damage <br />Prevention Council", <br />sponsored by Sunshine State <br />One Call of Florida (SSOCOF) <br />(2002-2006) <br /> <br /> <br />n1l~~:MAN <br /> <br />~ CONSULTING ENG'NEERS & SURVEYORS <br /> <br />ARACELY ANDOLLO-SOTO <br /> <br />Sr. Utility Coordinator <br /> <br />Mrs. Andollo has six years experience in utilities coordination on design-build and traditional design <br />for projects in Districts Four (Districtwide Utilities Contract); Five; Six, Turnpike Enterprise; and Miami- <br />Dade Expressway Authority. These projects include Combined Portal Tunnel; 3R; Open Road Tolling; <br />Toll Plaza Modifications; Bridge Jackings and Rehabilitation Projects. She has over ten years of vast <br />permitting experience through Municipal and Governmental Agencies such as WASD, DERM, FDEP, <br />SFWMD, Department of Health, and other State and Federal Agencies. Capable of managing the <br />construction phase of a project including RFI's; review and processing shop drawings; and <br />coordination between Client, Engineer and Contractor. She has established a good working <br />relationship with Utility and Project Managers from FOOT Districts 4, 5, 6 and Turnpike Enterprise; in <br />addition to Directors of Utilities Municipalities. Mrs, Andollo has experience with the coordination of <br />construction projects, funded by municipalities, for installation and repair of underground utilities. <br />She has vast experience with permitting process trough and Public Works Departments from <br />municipal and government agencies for installation and repair of underground utilities. <br /> <br />PROJECT EXPERIENCE <br />Mrs. Andollo recently joined FRA and is being integrated into existing projects. <br /> <br />Port of Miami Tunnel, Miami-Dade County, FOOT 6 (2008-2011). Ongoing Utility Coordination (with <br />local agencies such as Miami-Dade Water & Sewer Department; Florida Power & Light; Comcast and <br />AT&T Florida; in addition to State and Federal Agencies) for the relocation of existing utilities (and <br />railroad tracks) located within the Department's right-of-way. This Design-Build project consists of <br />three primary components: widening of Macarthur Causeway Bridge; combined portal tunnel <br />connection between Watson Island and Dodge Island; and connections to the Port of Miami roadway <br />system, Due to the complex nature of the project, all existing utilities in Dodge Island have been <br />designed to be relocated to a "utility corridor", eliminating possible conflicts with proposed tunnel <br />and roadway design. This tunnel will be the largest precast concrete segment lining tunnel in the U.S. <br />and is claimed to be the most difficult tunnel for tunnel construction in the world at this time. <br /> <br />All Electronic Tolling (AET) Conversion of SR-924 (Gratigny), SR-878 and SR-874 Design Build, <br />Miami-Dade County (2009-2010). Utility Coordination with local agencies (such as MD-WASD; FP&L; <br />AT&T Florida) and responsible for identifying existing utilities within the project corridor and <br />coordinating their relocation to avoid impacts with design and construction. This Design-Build <br />project included the reconstruction of the existing Gratigny Toll Plaza; two new collecting gantries <br />along SR 924; safety improvements along the areas east and west of the toll plaza, as well as five <br />additional toll collecting gantries along SR-878 and SR-874, <br /> <br />SR 869 (Sawgrass Expressway) Deerfield Toll Plaza Modifications, Broward County, Turnpike <br />Enterprise (2008-2009). Utility coordination between the Department, Engineer of Record, and <br />Utility Agency Owners for design-build project consisting of the widening of SR-869 and the <br />reconstruction of Deerfield Toll Plaza. <br /> <br />West Palm Beach Exit Ramp Bridge (over SR 91jFlorida Turnpike), Deck Clearance Upgrade, Palm <br />Beach County, Turnpike Enterprise (2005-2006). Utility coordination for the jacking of the bridge for <br />additional clearance. <br /> <br />SR A1A over Hillsboro Inlet, Broward County, Districtwide Utilities Contract, FDOT 4 (2005-2006). <br />Utility coordination for repair of bridge fender system. <br /> <br />SR 9 over Dania Cutoff Canal, Broward County, Districtwide Utilities Contract, FDOT 4 (2005-2006). <br />Utility coordination for rehabilitation of bridge fender system. <br /> <br />SR 707 (Dixie Highway) over 51. Lucie River, Martin County, Districtwide Utilities, FDOT 4 (2005- <br />2006). Utility coordination for repair of bridge's fender system, <br />SR 500 (US 441) 3R Improvements, Marion County, FDOT 5 (2005-2006). Utility coordination for <br />3R Improvements along approximately nine miles of roadway. <br /> <br />SR 50 from West of SR 520 to east of St. Anne Street 3R Improvements, Orange County, FDOT 5 <br />(2005-2006). Utility coordination for 3R Improvements along approximately seven miles of roadway. <br />