|
<br />'1
<br />
<br />
<br />'1
<br />
<br />r1
<br />
<br />r 1
<br />
<br />~ 1
<br />
<br />EXPERTISE
<br />Utility Coordination
<br />CEI
<br />ITS
<br />
<br />r I
<br />
<br />r J
<br />, J
<br />
<br />EXPERIENCE
<br />With FRA: 15 Years
<br />With Others: 5 Years
<br />
<br />r I
<br />. I
<br />
<br />EMPLOYMENT
<br />Joined FRA 3/1994
<br />
<br />, 1
<br />
<br />, I
<br />
<br />EDUCATION
<br />Engineering Major
<br />University of
<br />Pennsylvania
<br />
<br />, ,
<br />
<br />. J
<br />
<br />I . I
<br />
<br />A. A.
<br />Electronics
<br />Technology
<br />Devry
<br />
<br />, J
<br />
<br />CTQP TIN
<br />R530-1614-9460
<br />
<br />, J
<br />
<br />, I
<br />
<br />CERTIFICATIONS
<br />IMSA Certified Work Zone
<br />Specialist
<br />IMSA Certified Traffic Signal Levell
<br />IMSA Certified Traffic Signal Level II
<br />FOOT Site Manager
<br />FOOT Profile
<br />FOOT Final Estimates Level II
<br />CEllssues/Contract Administration
<br />CEI Consultant Series
<br />Traffic Control Plan Design
<br />Laboratory Information
<br />Management Module 2 & 3 (L1MS)
<br />
<br />~~.ALEMAN
<br />
<br />& Associates, Inc.
<br />CONSULTING ENGINEERS & SURVEYORS
<br />
<br />DENNIS ROWAND
<br />
<br />Project Administrator / Utility Coordinator
<br />
<br />Mr. Rowand has twenty years of experience in the engineering industry, he has worked in
<br />all areas including Utility Coordination, CEI, design of signalized intersections and
<br />communication systems, signing and traffic signal equipment inventory, and preparation
<br />of traffic control plan packages per FDOT and MUTCD procedures.
<br />
<br />PROJECT EXPERIENCE
<br />
<br />Districtwide Utility Coordination Services, FOOT 6 (2006 - 2011). Mr, Rowand has
<br />served as a Utility Coordinator, as needed, under this contract. During the life of this
<br />contract, FRA has received between a 4.0 and 4.7 composite grade. FRA has completed
<br />numerous major roadway projects under this contract and has provided on-site services,
<br />as needed.
<br />
<br />Tasks have included all phases of utility negotiations and relocation (electric,
<br />telecommunications/cable, water/sewer, gas/fuel). FRA has provided Utility Coordination
<br />services in accordance with FDOT's standards, policies and procedures and is familiar with
<br />FOOT's utility agreements. FRA has worked with various utilities companies (FPL
<br />Distribution, Transmission, Fibernet; Comcast; Bellsouth; Verizon; Miami-Dade Water &
<br />Sewer; Level 3 Communications; Qwest Communications, etc.) on multiple projects within
<br />Miami-Dade and Monroe County. The following is a list of the work orders Mr. Ramirez has
<br />worked on:
<br />· WO 48: 425598-1-52-01 SR-7 (NW 7 Ave) from NW 6 St to NW 32 St
<br />· WO 49: 425478-1-52-01 SR-93 (1-75) EB 1-75 ramp to SB SR-826 at NW 102 St.
<br />· WO 54: 425659-1-52-01 SR-9 (NW 27 Ave) from NW 103 St to NW 116 St
<br />· WO 72: 250080-2-52-01 SR-826 (Palmetto X-Way) from NW 22 Ave to NW 8 Ave
<br />· WO 74: 428480-1-52-01 SR-933 (NW 12 Ave) from NW 20 St to NW 29 St
<br />· WO 81: 249941-1-52-01 SR-823 (Red Rd NW 4 Ave) from W 46 St to W 53 St
<br />· WO 82: 249941-6-52-01 SR-823 (Red Rd NW 4 Ave) from W 53 St to W 65 St
<br />· WO 83: 249941-4-52-01 SR-823 (Red Rd NW 4 Ave) from W 65 St to W 84 St
<br />· WO 88: 250080-3-52-01 SR-826 (Palmetto X-Way) from NW 42 Ave to NW 22 Ave
<br />
<br />Contact: Mr. Tony Soto (305) 470-5232
<br />
<br />1-595 Roadway Improvements Projects - Maintenance of Broward County Fiber Optic
<br />Cable), FDOT 4 (2009-2011). The primary objective of this task was to provide
<br />construction plans for Maintenance of the existing Broward County ITS Fiber Optic Cable
<br />during all Construction Phasing of the 1-595 Improvement Project from University Drive to 1-
<br />95. It was determined that the majority of the existing Broward County ITS Fiber Optic
<br />Cable would be affected by the proposed project construction. FRA developed ITS plans
<br />that enabled the contractor to construct the main permanent conduit trunk-line and
<br />temporary cross-over conduit and temporary splice vaults as part of the MOT Phase I
<br />construction activities of both Zone 6 and Zone 7 from University Dr to East of SR 7. Mr.
<br />Rowand provided Utility Coordination through extensive field investigation and assisted
<br />FRA Designers in the development of BFO Relocation Plans. ITS plans were developed to
<br />incorporate all construction sequences and phasing until the permanent ITS Fiber Optic
<br />Network was fully constructed, while minimizing fiber splicing and down-time of the
<br />Broward County ITS Fiber Optic Cable. Contact: Mr. Robson Lima (954) 513-3805
<br />
<br />1-595 Roadway Improvements Projects - Power Service Design, FDOT 4. (2009-2011).
<br />This project involved FRA locating and documenting reliable power sources that were a
<br />critical part of the overall 1-595 project. Electrical design included, providing detailed
<br />power service locations within the project limits for Reversible Express Lanes Access
<br />Control subsystem (including all Gates), a CCTV camera subsystem, a DMS subsystem,
<br />Changeable Message Sign (CMS) subsystem, a HAR subsystem, a Microwave Vehicle
<br />Detection Station (MVDS) subsystem and Three Communication Hubs. The electrical
<br />design services also included the Toll Building and Toll Gantry electrical systems. Mr.
<br />Rowand coordinated all service points with FPL representatives, coordinated with design
<br />engineers for all changes in location due to relocation by FPL and provided utility
<br />coordination for power service points required for this very complex project spanning the
<br />entire length of 1-595. To enhance power reliability FRA designed a power distribution and
<br />backup system consisting of, underground electrical conductor circuits to all ITS Devices,
<br />transformers, generators, automatic transfer switches and UPS included as part of the
<br />scope of work. Mr. Rowand coordinated all locations for the back-up power equipment,
<br />provided all utility coordination for back-up equipment sites and assisted FRA designers
<br />with back-up equipment power requirements Contact: Mr. Chris Artis from FPL(954) 321-
<br />2049
<br />
<br />ITS CEI for 1-395, and Palmetto Expressway, FDOT 6 (2008 - 3/2010). FRA served as a
<br />subconsultant for this project, Mr. Rowand was assigned in the role of Contract Support
<br />Specialist (Office Engineer) on the following projects: Expansion of the ITS System on 1-395
<br />from 1-95 to Alton RD included in this project is the installation of 1 DMS sign, 16 CCTV
<br />cameras, 48 vehicle detectors, 16 pole mounted controller cabinets, power services,
<br />conduit, pull boxes, splice vaults and fiber optic cable. Mr. Rowand also oversaw the
<br />warranty repair on previously installed DMS signs on US-1 including reviewing the Repair
<br />Plans and procedures, MOT plans and Material Certifications. Contact: Ms. Dari Vorce
<br />(305) 499-2392
<br />
|