My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CSA
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
CSA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2012 5:06:27 PM
Creation date
2/8/2012 5:02:19 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs.
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />rl <br />l <br />r 1 <br />r 1 <br />r 1 <br />r 1 <br />~ 1 <br />~ 1 <br />~ I <br /> <br />and tidal flooding problems at Riviera Isles (Phase <br />I) for the City of Fort Lauderdale. Proposed drainage <br />improvements include 6 deep drainage wells and three <br />pump stations. <br /> <br />Survey: <br />Consul Tech Enterprises} Inc. is a CSA company and <br />therefore, we have in-house capabilities to perform all <br />survey needs requested in the RFQ. Consul Tech utilizes <br />the newest technology when performing topographic <br />surveys. Consul Tech employs the use of several data <br />collections systems such as Real Time Kinematic <br />(RTKL Digital Echo-sounders} Electronic Digital levels} <br />Robotic Total Stations} Electronic Field Book (EFB) <br />and Cadastral Electronic Field Book (CEFB). We have <br />a highly experienced staff equipped with the latest <br />software} including the Micro Station XM} GeoPak} <br />CAiCE} AutoCAD} and Softdesk. We can provide any <br />electronic format of data delivery that may be required. <br />The most critical element in performing a boundary <br />survey is the initial research of the property along with <br />the extensive review of any matters of record which <br />affect the property that are reflected in a title report or <br />commitment. A clear and correct legal description must <br />be calculated and written to reflect the boundary. The <br />legal description should also be checked against any <br />adjoining properties to ensure that there are no JJgapsJJ <br />or JJoverlapsJJ which may affect the subject properties. <br />Once the legal description has been created and/or <br />verified} a field crew is dispatched to the property in <br />order to locate any sectionalized land corners or other <br />monumented corners that have been referenced in <br />the legal description. If the monumented corners are <br />not found} then additional field work is performed in <br />order to gather sectional information needed in the <br />re-establishment of lost or obliterated corners. Once <br />calculated and re-set} a Certified Corner Record form <br />is completed and filed with the appropriate agencies. <br />Consul Tech has extensive experience in the re- <br />establishment of lost and obliterated corners} having <br />retraced a number of sections throughout south and <br />central Florida. The final phase of a boundary survey is <br />to locate any improvements as specified by the client <br /> <br />I <br />, I <br />l J <br /> <br />, 1 <br />l 1 <br /> <br />I f I <br /> <br />c I <br /> <br />l J <br /> <br />1 J <br /> <br />, J <br /> <br />, J <br /> <br />and prepare a sketch of survey depicting the results. <br /> <br />Geotech n ica I: <br />CSA has teamed up with HRES, Inc. which has <br />extensive knowledge of soils conditions and have <br />performed numerous geotechnical test I the vicinity <br />of the project area. The expertise of HRES} Inc. is very <br />valuable for our team since we can evaluate in advance <br />the proper methodology for the drainage design and <br />construction. <br />HRES} Inc. considers that on West of Collins Avenue} <br />the percolation test results may be around E-S to E-6 <br />because of the silt/muck layers. On Collins and east of <br />Collins, the values are good, E-3} E-4. As we approach <br />North Bay Road} our experience indicates that below <br />the pavement there are 3-4 feet offill material followed <br />by organics and silt layers down to 7 to 10 feet. Then} <br />the sands may be found. Near the Intracoastal, these <br />subsurface conditions worsen. As we approach Collin <br />Avenue} the subsurface conditions get better because <br />of the sand bar along Collins Avenue. <br /> <br />Utilities: <br />Utility Coordination is one of the items that typically can <br />delay any project if the coordination is not executed as <br />scheduled. To perform this important activity, we have <br />assigned F.R. Aleman & Associates} Inc.} a DBE certified <br />firm and an industry leader in utility coordination <br />and execution process that will ensure the most <br />experienced professionals are handling this critical <br />element of the design process. This process will begin <br />during the Initial Engineering phase and continue until <br />utility clearance certifications are obtained. <br /> <br />Plans Production: <br />. Final Design <br />Upon approval or acceptance from the City of <br />the design Alternative chosen} work commences <br />with the preparation of final construction plans} <br />specifications and cost estimates. In developing the <br />final construction plans, we will review the following <br />major milestones: 30% design} 60% design} 90% <br />design and 100% design. Much of the 30% design <br />,,"'IW... .. .0."' <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.