Laserfiche WebLink
<br />r] <br /> <br /> <br />CIVIL ENGINEERING SERVICES <br />TO DESIGN STREET AND DRAINAGE IMPROVE <br />BID NO. 11-11-02 <br /> <br /> <br />1 <br />~l <br /> <br />r 1 <br />, <br />I <br /> <br />f 1 <br /> <br />j <br /> <br />1 <br />j <br /> <br />. I <br /> <br />I '1 <br />I <br /> <br />, 1 <br /> <br />. J <br /> <br />N.W. 82nd Avenue Improvements <br />Doral, Florida <br /> <br />C3TS was contracted by the City of Doral for the design of NW 82 Ave, between NW 12 St and NW 25 St, which is a four lane <br />divided road way located within the City of Doral's industrial/commercial area. Improvements consist of milling and resurfacing, <br />installation of approximate 1500 linear feet of infiltration trench, sidewalks and curb and gutter repairs, This project is still in its <br />bidding phase. <br /> <br /> <br /> <br />Redevelopment of Gravity Drainage Wells <br />Key Biscayne, Florida <br /> <br />This project involved the cleaning, rehabilitation, and redevelopment of 30 existing gravity drainage wells located throughout the <br />Village. Responsibilities included inspections, management, and conducting testing at each well to ensure expected discharge <br />capacity was achieved, The work was funded by a grant from the South Florida Water Management District. <br /> <br />20 <br />