Laserfiche WebLink
<br />r1 <br /> <br />r 1 <br /> <br />, 1 <br /> <br />r 1 <br /> <br />, J <br />I <br /> <br />r 1 <br />I <br />I <br /> <br />. \ <br /> <br />, \ <br /> <br />-l <br /> <br />. , <br /> <br />__COR ZO <br />_CASTELLA <br />CARBAllO <br />rrm THOMPSON <br />L..I:J.I:JSALMAN <br /> <br />SEAN COMPEL, P.E., LEED AP <br />Senior Construction Administrator <br /> <br />EXPERIENCE <br />Mr. Compel has over 9 years of experience in the construction of civil engineering and site development <br />projects. He has served as project construction administrator and project engineer for various drainage, <br />water, sewer, underground electrical, and industrial projects. His experience in construction service has <br />allowed him to effectively deliver projects satisfying all owner requirements. Responsibilities during <br />construction include permitting, review of scheduling, and overall cost analysis. He is proficient at various <br />software packages including Microsoft Project, MBR (SFWMD Multi-Basin Routing Software), <br />Flowmaster, AutoCAD, AutoTUI11 and EaglePoint. Some of his project experience includes: <br /> <br />. Village of Key Biscayne Redevelopment of Gravity Drainage Wells, Key Biscayne, Florida - This <br />project involved the cleaning, rehabilitation, and redevelopment of 30 existing gravity drainage wells <br />located throughout the Village. Responsibilities included inspections, management, and conducting <br />testing at each well to ensure expected discharge capacity was achieved. The work was funded by a grant <br />from the South Florida Water Management District. <br /> <br />. NW 82nd Avenue Improvements, Doral, Florida - Project Manager and Construction Administrator <br />for this project which included the study, design, and construction administration of various <br />improvements on NW 82nd A venue from NW 12th Street to NW 25th Street. It consisted of milling and <br />resurfacing, sidewalk and curb and gutter replacement and reconstruction, handicap ramp replacement, <br />and drainage work including the installation of exfiltration trenches, concrete manholes and solid pipes. <br />The project also involved the repair of damaged asphalt around existing manholes, valves, and above <br />existing drainage trenches and crossings. The final design also included pavement markings and signage. <br /> <br />. VilIagewide Drainage Improvements, Palmetto Bay, Florida - Construction Administrator for this <br />project which involved drainage improvements at 10 locations throughout the Village of Palmetto Bay. <br />These 10 areas were identified by the Village as having flooding problems. The improvements included <br />new drainage structures, exfiltration trenches, outfalls, and asphalt overlays. The project was completed <br />on schedule and under budget. <br /> <br />. South Miami Downtown Improvements, South Miami, Florida - Construction Administrator and <br />Project Designer for these improvements within the South Miami Downtown area. The improvements <br />consisted of the design, permitting, and construction of streetscape improvements including watermain <br />extensions, new French drains, new wide pedestrian friendly sidewalks, irrigation, lighting, and <br />landscaping. These updated systems were vital to allow the downtown area to develop and expand. <br />Responsibilities during construction included coordination with local merchants to minimize impact of <br />construction on their business. <br /> <br />. Village of Key Biscayne Zones 1 & 4 Water Main and Sanitary Sewer Replacement, Key Biscayne, <br />Florida - Construction Manager responsible for the construction administration for this project that <br />includes the construction of sanitary sewers, manholes, existing pump station upgrades and modifications, <br />lateral connections, fire hydrants, water main replacement including valves and appUlienances, and <br />roadway/right-of-way restoration, and other related work as shown on the plans. <br /> <br />. Village of Key Biscayne Zones 2 & 3 Reclaimed Water & Line Replacement Sanitary Sewer, Key <br />Biscayne, Florida - Director of Construction Services responsible for the construction administration for <br />this project that includes the construction of sanitary sewers, manholes, existing pump station upgrades <br />and modifications, lateral connections, fire hydrants, water main replacement including valves and <br />appurtenances, and roadway/right-of-way restoration, and other related work as shown on the plans. In <br />addition to observing the on-going work, digital pictures were taken at almost every visit to record the <br />project progress. <br /> <br />. Pinecrest Watermain Master Plan and System Design, Pinecrest, Florida - Project Manager and <br />Construction Administrator for the installation of over 12 miles of watermain infrastructure throughout <br />the Village. This two phase project provided potable water to over 550 properties previously connected to <br />individual private wells. This successful project also included the implementation of a system to allow <br />each homeowner to select the best location for their new water meter. <br /> <br />. Golden Beach Capital Improvements Program, Golden Beach, Florida - Construction Administrator <br />for this comprehensive Capital Improvements Program Master Plan that focuses on several major <br />improvement areas: town-wide drainage improvements; utilities underground relocation (electrical, <br />telephone, cable); and town-wide streetscape & traffic calming. The Master Plan carefully considered <br />each of these with respect to feasibility, costlbenefit, and design, as well as an analysis of funding options <br />and scenarios, and schedule for phasing and implementation. <br /> <br />EDUCATION <br />Bachelor of Science in <br />Civil Engineering, <br />University of Miami. <br />2002 <br /> <br />PROFESSIONAL <br />REGISTRATION <br />Florida Professional <br />Engineering License <br />No. 66618 <br /> <br />LEED Accredited <br />Professional <br /> <br />33 <br />