Laserfiche WebLink
<br />f-I <br /> <br /> <br />CIVIL ENGINEERING SERVICES <br />TO DESIGN STREET AND DRAINAGE IMPROVE <br />BID NO. 11 - 1 1 -02 <br /> <br /> <br />r I <br /> <br />. 1 <br />J <br /> <br />, j <br /> <br />, , <br /> <br />, , <br /> <br />. J <br /> <br />'NtD METHODOLOGY <br /> <br />COST ESTIMATING AND SCHEDULING CONTROL <br /> <br />C3TS is experienced in permit and plan production scheduling for certain types of projects, Permitting can affect the cost estimate <br />from the basis that last minute changes required by agencies can sometimes blow estimates out of the water and cancel projects <br />altogether. We shall determine all possible impacts early on so that the preliminary cost estimates stay relatively the same as the plans <br />are finalized, A schedule shall be submitted at the NTP so the City can track production as well as permitting all the way through bid <br />and security of contractor. Construction material costs have varied greatly over the last few years causing a lot of problems with <br />accurate cost estimates, C3TS has general contractors on staff as well as experienced construction administrators to ensure that cost <br />estimates are current and realistic, <br /> <br />QUALITY CONTROL <br /> <br />At C3TS, we use the most current technology, which allows for optimum and accurate design, We use an in-house peer review Quality <br />Control/Quality Assurance (QAlQC) program to complete our assignments within schedule, at budgeted cost, and with high quality <br />and reliability, All work is executed in conformance with applicable codes and standards, The work of any sub-consultants we use is <br />subjected to the same review as our C3TS generated work. <br /> <br />We are proud to be able to say that, over the past 10 years, our firm-wide errors and omissions resulting in claims are less than Y2 of <br />1 % of construction budgets. This is due to the following: <br />Principal Involvement during all stages of design and construction <br />Proper matching of tasks to individuals <br />Complete team formation from the start <br />Clear assignments of responsibilities <br />Established and adhered-to QA / QC Program <br />Independent peer review prior to major deliverables <br /> <br />PLAN METHODOLOGY <br /> <br />The C3TS quality control team utilizes a two-part independent checking process for its projects. First and foremost is the development <br />of the QC program to verify that the project analysis methods and work products meet or exceed the requirements of the project scope <br />for all work items, are free of errors and omissions, and are based on sound practices and principles, Second is the development of <br />the QA program to assure that the QC program is being complied with and is effecting compliance with the project scope of services. <br />Basic tenets of the QC program include: <br /> <br />../ The project manager has complete authority and responsibility to execute the work. <br /> <br />../ A "kick-off' meeting will be held with key members of the project team to define the scope of work and the quality requirements. <br /> <br />../ All project decisions will be documented. <br /> <br />../ All supporting calculations, text or data used to develop the project documents will be signed and dated by the preparer when <br />the work is performed, All telephone conversations and meetings, which include or affect a project decision, will be documented. <br />Minutes of meetings will be prepared and distributed to attendees for confirmation of decisions made and then filed after <br />appropriate action. <br /> <br />../ All project documents will be reviewed and/or checked by qualified individuals who are not directly performing the initial work <br />activity. The individual doing the checking will sign and date the documents and will prepare a record of review after checking <br />the findings. The findings will be resolved by the originator of the document and rechecked until satisfactorily resolved. <br /> <br />49 <br />