Laserfiche WebLink
<br />r 1 <br />r 1 <br />I 1 <br />r 1 <br /> <br />r 1 <br />I <br /> <br />, 1 <br /> <br />~ J <br /> <br />, J <br /> <br />. J <br /> <br />t . j <br /> <br />. ~ <br /> <br />. I <br /> <br /> <br />Public Works Department <br /> <br />Rofoel G. Cosols <br />Public Works Director <br /> <br />November 18, 2010 <br /> <br />T own of Miami lakes <br />AUn: Town Clerk's Office <br />15700 NW 67th Avenue, Suite 302 <br />Miami lakes, Florida 33014 <br /> <br />Reference: <br /> <br />Corzo Castella Carballo Thompson Salman, PA (C3TS) <br /> <br />Please accept this letter of reference for the firm Corzo Castella Carballo Thompson Salman, PA (C3TS) <br /> <br />Contract Name: <br /> <br />Town of Cutler Bay Old Cutler Roadway Improvements <br /> <br />Contract Date: <br /> <br />March 2010 - On-qoinq (Biddinq Phase) <br /> <br />Contract value: $475,000.00 <br /> <br />Description': <br /> <br />C3TS was contracted by the Town of Cutler Bay to design improvements for the portion of Old Cutler Road between SW 971h <br />Avenue and SW 871h Avenue. The project consists of improvements including roadway improvements, traffic circles, pavement <br />resurfacing, sidewalks, drainage facilities, medians, landscaping and lighting. <br /> <br />Old Cutler Road is designated a historic roadway which required all improvements to respect the existing roadway footprint, <br />thus limiting the modification and/or additional widening of the road. This Miami-Dade County roadway is considered an <br />arterial collector roadway. The proposed configuration for Old Cutler Road will include roundabouts at each end of the <br />corridor for traffic calming and beautification. The 1.24 mile corridor between these two roundabouts will be a two lane <br />roadway with turn lanes, landscape medians and additional stormwater drainage structures. Permitting included various <br />Miami-Dade County Public Works Division and Miami-Dade DERM. The project is entering the bidding phase and construction <br />cost is estimated to be $ 7,100,000. <br /> <br />Reference: <br /> <br />The consultant has performed very well, throughout this project. This project required a great deal of community outreach and <br />coordination with Miami-Dade County Public Works and the State of Florida. The project design was completed within the <br />allowable timeframe and within budget. <br /> <br />If you should have any question or require any further information, please contact me at 305-234-4262 or via em ail at <br />rcasals@cutlerbay-f1.gov. <br /> <br />Sincerely, <br /> <br />\7-{~~ <br /> <br />Rafael G. Casals <br />Public Works Director <br /> <br />10720 Caribbean Boulevard, Suite 105 . Cutler Bay. FL 33189 . 305-234-4262 . www.cutlerbay-fl.gov <br /> <br />~~~-~~>;.-~~ <br /> <br />51 <br />