My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Craig A. Smith #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2012 10:46:11 AM
Creation date
2/9/2012 10:18:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'1 <br /> <br />, 1 <br />I <br /> <br />, 1 <br />I <br /> <br />I <br />1 <br />I · <br /> <br />I <br />I.. <br /> <br />i l <br /> <br />. 1 <br /> <br />. j <br /> <br />QUAUFICATIONS <br /> <br />. Stormwater Pump Station NO.4 2005 <br />Contact: Paul Callsen, Director of Public Works, City of Sunrise <br />Two natural gas engine drive stormwater pumps at 90 CFS each including the building. <br /> <br />. Stormwater Pump Station - West, Central & East Renovation 2004 <br />Contact: Alan Lam, Project Manager, City of Tamarac <br />Construction of three (3) master stormwater pump stations including building, landscaping, and <br />backup power with capabilities ranging from 80 CFS to 240 CFS each pump station. <br /> <br />. Stormwater Master Plan 2003 <br />Contact: Jason Walker, Village Manager, Village of EI Portal <br />The primary objective of the project was to develop a comprehensive stormwater master plan <br />for the Village of EI Portal. The plan identified and determined cost effective conceptual <br />solutions to resolve existing flooding conditions through best management practices in the <br />development of a new and retrofitted stormwater system while addressing water quality and <br />water quantity concerns. <br /> <br />. Stormwater Master Plan 2002 <br />Contact: Robert Levy, Town Administrator, Town Pembroke Park <br />The primary objective of the study was to compile a comprehensive stormwater master plan for <br />the entire Town of Pembroke Park and to identify and determine corrective actions required to <br />resolve existing flooding conditions through best management practices in the development of <br />new and retrofitted stormwater system. <br /> <br />CRAIG A. SMITH <br />& ASSOCIATES <br /> <br />Proposer: Craig A. Smith & Associates <br /> <br />RFQ No. 11-11-02 <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.