Laserfiche WebLink
'1 <br /> <br />, 1 <br />I <br /> <br />, 1 <br />I <br /> <br />I <br />1 <br />I · <br /> <br />I <br />I.. <br /> <br />i l <br /> <br />. 1 <br /> <br />. j <br /> <br />QUAUFICATIONS <br /> <br />. Stormwater Pump Station NO.4 2005 <br />Contact: Paul Callsen, Director of Public Works, City of Sunrise <br />Two natural gas engine drive stormwater pumps at 90 CFS each including the building. <br /> <br />. Stormwater Pump Station - West, Central & East Renovation 2004 <br />Contact: Alan Lam, Project Manager, City of Tamarac <br />Construction of three (3) master stormwater pump stations including building, landscaping, and <br />backup power with capabilities ranging from 80 CFS to 240 CFS each pump station. <br /> <br />. Stormwater Master Plan 2003 <br />Contact: Jason Walker, Village Manager, Village of EI Portal <br />The primary objective of the project was to develop a comprehensive stormwater master plan <br />for the Village of EI Portal. The plan identified and determined cost effective conceptual <br />solutions to resolve existing flooding conditions through best management practices in the <br />development of a new and retrofitted stormwater system while addressing water quality and <br />water quantity concerns. <br /> <br />. Stormwater Master Plan 2002 <br />Contact: Robert Levy, Town Administrator, Town Pembroke Park <br />The primary objective of the study was to compile a comprehensive stormwater master plan for <br />the entire Town of Pembroke Park and to identify and determine corrective actions required to <br />resolve existing flooding conditions through best management practices in the development of <br />new and retrofitted stormwater system. <br /> <br />CRAIG A. SMITH <br />& ASSOCIATES <br /> <br />Proposer: Craig A. Smith & Associates <br /> <br />RFQ No. 11-11-02 <br /> <br />7 <br />