My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Craig A. Smith #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2012 10:46:11 AM
Creation date
2/9/2012 10:18:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1 <br /> <br />, 1 <br /> <br />I 1 <br />I <br /> <br />. I <br />I I <br />; 1 <br /> <br />I J <br /> <br />1 <br />I <br />J <br /> <br />I . I <br />I <br /> <br />.' I <br />i 1 <br /> <br />I I <br /> <br />I I <br /> <br />QUAUFICATIONS <br /> <br />PROPOSED SERVICES <br /> <br />TASK <br />1. <br /> <br />DESCRIPTION EST. SCHEDULE <br /> <br />Preliminary Plan of Project 0.5 month <br /> <br />2. <br /> <br />Meetings with City for Approval <br /> <br />3. <br /> <br />Above Ground Route Survey 1 month <br /> <br />4. <br /> <br />Underground Survey SUE Utility Locating by 3D Radar Scanning 1.5 months <br />(performed concurrently with #3) <br /> <br />5. <br /> <br />Develop Base Maps for Design 1 month <br /> <br />6. <br /> <br />Preliminary Engineering Design 1.5 months <br />(concurrent with #5) <br /> <br />7. <br /> <br />Approval Meeting with City <br /> <br />8. <br /> <br />Final Design and Construction Plans, Contract Documents <br />And Specifications <br /> <br />2 months <br /> <br />9. <br /> <br />Permitting <br />(performed concurrently with #5-8) <br /> <br />4 months <br /> <br />Estimated Time for Design <br /> <br />6 months <br /> <br />10. <br /> <br />. 1.5 months <br /> <br />Bidding <br /> <br />11. <br /> <br />0.5 month <br /> <br />Project Award <br /> <br />12. <br /> <br />9 months <br /> <br />Construction Management <br /> <br />CAS commits to having continuous meetings with the City Staff and to provide scheduled <br />deliverables. <br /> <br />CRAIG A. SMITH <br />& ASSOCIATES <br /> <br />Proposer: Craig A. Smith & Associates <br /> <br />RFQ No. 11-11-02 <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.