Laserfiche WebLink
<br />1 <br /> <br />, 1 <br /> <br />I 1 <br />I <br /> <br />. I <br />I I <br />; 1 <br /> <br />I J <br /> <br />1 <br />I <br />J <br /> <br />I . I <br />I <br /> <br />.' I <br />i 1 <br /> <br />I I <br /> <br />I I <br /> <br />QUAUFICATIONS <br /> <br />PROPOSED SERVICES <br /> <br />TASK <br />1. <br /> <br />DESCRIPTION EST. SCHEDULE <br /> <br />Preliminary Plan of Project 0.5 month <br /> <br />2. <br /> <br />Meetings with City for Approval <br /> <br />3. <br /> <br />Above Ground Route Survey 1 month <br /> <br />4. <br /> <br />Underground Survey SUE Utility Locating by 3D Radar Scanning 1.5 months <br />(performed concurrently with #3) <br /> <br />5. <br /> <br />Develop Base Maps for Design 1 month <br /> <br />6. <br /> <br />Preliminary Engineering Design 1.5 months <br />(concurrent with #5) <br /> <br />7. <br /> <br />Approval Meeting with City <br /> <br />8. <br /> <br />Final Design and Construction Plans, Contract Documents <br />And Specifications <br /> <br />2 months <br /> <br />9. <br /> <br />Permitting <br />(performed concurrently with #5-8) <br /> <br />4 months <br /> <br />Estimated Time for Design <br /> <br />6 months <br /> <br />10. <br /> <br />. 1.5 months <br /> <br />Bidding <br /> <br />11. <br /> <br />0.5 month <br /> <br />Project Award <br /> <br />12. <br /> <br />9 months <br /> <br />Construction Management <br /> <br />CAS commits to having continuous meetings with the City Staff and to provide scheduled <br />deliverables. <br /> <br />CRAIG A. SMITH <br />& ASSOCIATES <br /> <br />Proposer: Craig A. Smith & Associates <br /> <br />RFQ No. 11-11-02 <br /> <br />9 <br />