My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Craig A. Smith #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2012 10:46:11 AM
Creation date
2/9/2012 10:18:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'1 <br /> <br /> <br />r 1 <br /> <br />Vr-uject Vr-()file~ <br /> <br />r 1 <br /> <br />. 1 <br />I <br /> <br />· 1 <br />I I <br />I r 1 <br />I <br />J <br />I r 1 <br /> <br />I <br />t <br />I <br /> <br /> <br />MASTER PLAN EXERPT <br /> <br />'tOWN ........ -...at <br />eottaPNM........ .....,.,... MAN <br />---- <br /> <br />. I <br /> <br />DESIGN PLAN EXCERPT <br /> <br /> <br />f 1 <br /> <br />" 1 <br /> <br />PROJECT NAME: <br />PROJECT ENTITY: <br /> <br />STORMWATER MASTER PLAN UPDATE <br /> <br />CONTACT NAME/NO: <br /> <br />Town of Golden Beach <br />One Golden Beach Drive <br />Golden Beach, Florida 33160-2296 <br /> <br />Alexander Diaz, Town Manager <br />(305) 932-0744 <br /> <br />PROJECT DESCRIPTION: <br /> <br />The intent of the project was to utilize and enhance an existing master <br />plan. The updated master plan incorporated existing stormwater facilities <br />with a conceptual design in order to achieve a comprehensive system <br />that would improve the Town's flood protection. Due to the existing con- <br />ditions within the Town (i.e., tidal influences and low topography) storm- <br />water pumps stations and water quality structures were implemented in <br />order to address the water quantity and quality of runoff prior to dis- <br />charge. <br /> <br />PROJECT INITIATION: <br />PROJECT COMPLETION: <br /> <br />FALL 2001 <br />SPRING 2003 <br /> <br />~ <br /> <br />Craig A. Smith & Associates <br />ENGINEERS. SURVEYORS. UTILITY LOCATORS. GRANTS ASSISTANCE <br /> <br />PP02-00 <br /> <br />Proposer: Craig A. Smith & Associates <br /> <br />RFQ No. 11-11-02 <br /> <br />ADMIN/PROPOSALS/PROJECTPROFILES/05526 <br />
The URL can be used to link to this page
Your browser does not support the video tag.