Laserfiche WebLink
<br />r 1 <br />r 1 <br />'1 <br /> <br /> <br />Vr-()ject Vr-()files <br /> <br />r 1 <br />I <br /> <br />, I <br />I <br /> <br />I J <br />! I J <br /> <br />I I <br />I <br />1 <br /> <br />'J <br /> <br />. J <br /> <br />BEFORE <br /> <br />AFTER <br /> <br />PROJECT NAME: <br /> <br />NE 40TH CT (NE 6TH AVE TO DIXIE HWY) STORM- <br />WATER IMPROVEMENTS <br /> <br />PROJECT ENTITY: <br /> <br />City of Oakland Park <br />250 NE 33rd Street <br />Oakland Park, FI 33334 <br /> <br />Dave Womacks, Director <br />(954) 561-6280 <br /> <br />CONTACT NAME/NO.: <br /> <br />. I <br /> <br />PROJECT DESCRIPTION: <br /> <br />Installation of drainage improvements on NE 40th Ct <br />between 6th and 10th Avenues. Drainage improve- <br />ment to consist of exfiltration trenches and full size <br />catch basins with tie-ins (overflow lines) to the NE <br />6th Ave system with interconnects to the drainage <br />systems recently installed along NE 42 Street to the <br />North. Road to be repaved after drainage installation. <br /> <br />RESPONSIBILITIES: Design, Bidding, Engineering Services and Construc- <br />tion Services <br /> <br /> <br />~ Craig A. Smith & Associates <br />~ CONSULTING ENGINEERS. PLANNERS. SURVEYORS. GRANTS SPECIALISTS <br /> <br />Proposer: Craig A. Smith & Associates <br /> <br />RFQ No. 11-11-02 <br /> <br />ADM INIPROPOSALS/PROJECTPROFILESJ,7 <br />No. 06f <br />