Laserfiche WebLink
'1 <br />'1 <br />r 1 <br />r 1 <br /> <br /> <br />Vr-uject Vr-ufiles <br /> <br />r 1 <br />J <br /> <br />. 1 <br />I <br /> <br />, I <br /> <br />. I <br /> <br />PROJECT NAME: <br /> <br />STORMWATER IMPROVEMENT & PUMP STATION <br />PHASES I, II, III <br /> <br />PROJECT ENTITY: <br /> <br />CITY OF SWEETWATER <br />500 SW 1 09th Ave <br />Sweetwater, FL 33174 <br /> <br />Mayor Manuel Marono <br />(305) 221-0411 <br /> <br />CONTACT NAME/NO.: <br /> <br />PROJECT DESCRIPTION: <br /> <br />Installing Gravity Stormwater collection system, <br />Pump stations and Force Main Distribution system to <br />C-4 Canal. Phase I two pump stations each 20 CFS. <br />Phase III two pump stations each 40 CFS. <br /> <br />RESPONSIBILITIES: <br /> <br />Planning, design, permitting, bidding, construction <br />management and full time resident construction ob- <br />servation services. <br /> <br />CONSTRUCTION COST: <br /> <br />Phase I - $2,170,000 <br />Phase III - $4,270,000 <br /> <br />Q <br />Craig A. Smith & Associates <br />ENGINEERS. SURVEYORS. UTILITY LOCATORS. GRANTS SPECIALISTS <br /> <br />Proposer: Craig A. Smith & Associates <br /> <br />RFQ No. 11_11_6:PMIN/PROJECTPROFILES/SWEETW A TERI-II-III-pp02-069PUB.29 <br />