Laserfiche WebLink
'I <br />1 <br />'1 <br />I <br /> <br />Vr-()ject Vr-()files <br /> <br /> <br />'] <br /> <br />, 1 <br /> <br />; I <br />J <br /> <br />1 1 <br /> <br />PROJECT NAME: <br /> <br />PHASE III AND IV OF THE STORMWATER <br />COLLECTION SYSTEM AND PUMP STATION <br />MASTER PLAN AND DESIGN <br /> <br />, I <br /> <br />, , <br /> <br />. I <br /> <br />PROJECT ENTITY: <br /> <br />Town of Golden Beach <br />One Golden Beach Drive <br />Golden Beach, FL 33160-2296 <br /> <br />, , <br /> <br />CONTACT NAME/NO: Alexander Diaz, Town Manager <br />(305) 932-0744 <br /> <br />PROJECT DESCRIPTION: A pumped stormwater collection, treatment and <br />disposal system to serve a portion of the Town of <br />Golden Beach. Phase III & IV pump station design, <br />two (2) submersible pumps each 12 CFS <br /> <br />RESPONSIBILITIES: Re-evaluation, design, permitting and construction <br />services for Phase III and IV of a six (6) phase <br />Stormwater Master Plan. <br /> <br />TOTAL PRICE: Phase III & IV-$2,031,000 <br />PROJECT INITIATION: Design-October 2000 <br /> <br />PROJECT COMPLETION: Currently under construction <br /> <br />e <br />Craig A. Smith & Associates <br />ENGINEERS. SURVEYORS. UTILITY LOCATORS. GRANT SPECIALISTS <br /> <br />Proposer: Craig A. Smith & Associates <br /> <br />ADMIN/PROPOSALS/PROJECTPROFILES/GOLDENBEACH -pp02-070.PUB30 <br />RFQ No. 11-11-02 <br />