Laserfiche WebLink
<br />r 1 <br />1 <br />r I <br /> <br />, 1 <br /> <br />, 1 <br /> <br />. I <br /> <br />APPROACH / METHODOLOGY <br /> <br />PHASE V - OPERATIONS & START-UP <br />. Prepare Project Startup and Testing Plan <br />. Project Close-Out <br />. Conduct operator training Sessions <br />. Supervise, manage and coordinate all startup and testing activities <br />. Provide Operation and Maintenance Manuals <br />. Prepare record drawings and specifications <br />. Prepare final accounting and close out reports <br /> <br />Quality control throughout the Project Duration is handled by means of a check and balance <br />system and through the team's client relationships we form during the project providing open and <br />honest lines of communication. <br /> <br />Members of the Project Team will meet regularly to establish consistent quality review framework. <br /> <br />. Quality Standards are fundamental to the success of the project. CAS prides itself on the <br />consistent high quality of our output, whether it is project plans, specifications, design <br />elements, comprehensive studies, survey, GIS mapping, utility locates or grant writing. <br /> <br />. At CAS we are committed to achieving and maintaining the highest quality standards <br />possible and ensuring the client's satisfaction. <br /> <br />PROJECT MONITORING & BUDGETING <br /> <br />In order to get the most accurate budget price at the pre-construction phase and the construction <br />phase, CAS details all design items into many small parts that will add up to one whole part (Bill of <br />Materials). By doing this our cost estimates are very accurate. Our track record with cost <br />estimates to bids has been within 5-10%. CAS' philosophy utilizes a phased approach towards <br />assisting the City in problem solving and for implementation of public works and planning projects. <br />Schedule, Cost Control and Team Work - the CAS approach is to develop milestones and defined <br />deliverables with the City in order to meet the City's requirements. We try to identify potential <br />issues early in the project so necessary action can be taken to keep the project on schedule. We <br />continually update the cost of the project in order to stay on budget. If an issue develops with the <br />schedule, cost or the budget, we advise the City and develop a plan for corrective measures with <br />the staff. We consider the City and CAS as one team, all striving for the same goal of a quality <br />product on schedule and on budget for the City's residents. CAS Technical Reviews are conducted <br />throughout the project schedule by the Principal members of our firm as part of our commitment to <br />quality engineering. <br /> <br />Our goal is to have no change orders. <br /> <br />CRAIG A. SMITH <br />& ASSOCIATES <br /> <br />Proposer: Craig A. Smith & Associates <br /> <br />RFQ No. 11-11-02 <br /> <br />61 <br />