My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Craig A. Smith #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2012 10:46:11 AM
Creation date
2/9/2012 10:18:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, 1 <br />'1 <br />F 1 <br /> <br />APPROACH / MErHODOLOGY <br /> <br />The CAS philosophy utilizes a phased approach towards assisting the City in problem solving and <br />for implementation of the project. Our project approach is follows: <br /> <br />PHASE I - PROJECT DEVELOPMENT AND PLANNING <br />. Meeting with City Staff to develop the project scope <br />. Develop a fee proposal to match the project scope; lump sum or hourly <br />. Finalize the scope and proceed with a kickoff meeting with the City Staff <br />. Schedule of Values and Costs to City <br />. Establish milestones <br /> <br />PHASE II - PRELIMINARY DESIGN ENGINEERING <br />. Survey site and develop base maps for design <br />. Soil borings and testing as required <br />. Review existing plans and evaluate field conditions <br />. Utility Locates utilizing available designating technologies; 3D Radar Scanning <br />. Utilize necessary Engineering design methods <br />. Establish all design requirements for City approval <br />. Establish all permitting requirements <br />. Prepare preliminary cost estimate and project schedule <br />. Prepare preliminary engineering project report <br />. Quality control meetings with CAS staff <br />. Meet with City Staff to review project design, schedule and budget <br />. Prepare preliminary Bill of Materials <br /> <br />PHASE III - FINAL ENGINEERING <br />. Finalize base sheets for design <br />. Preparation of final construction plans <br />. Preparation of final specifications and contract documents <br />. Finalize cost estimate <br />. Meet with City Staff to review project design, schedule and budget <br />. Finalize permitting <br />. Provide Bill of Materials for purchase of equipment <br /> <br />PHASE IV - CONSTRUCTION <br />. Mobilize and prepare site <br />. Prepare safety plan <br />. Project field stake-out <br />. Begin construction <br />. Shop drawing submittal <br />. Construction management and administration <br />. Construction inspection <br />. Final construction <br />. Final punch-list <br /> <br />CRAIG A. SMITH <br />& ASSOCIATES <br /> <br />Proposer: Craig A. Smith & Associates <br /> <br />RFQ No. 11-11-02 <br /> <br />60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.