My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Craig A. Smith #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2012 10:46:11 AM
Creation date
2/9/2012 10:18:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />r 1 <br />1 <br />1 <br /> <br />, 1 <br />J <br /> <br />. I <br /> <br />j ~! <br /> <br />APPROACH / METHODOLOGY <br /> <br />COORDINATION WITH OTHER UTILITIES <br /> <br />Coordination with other utilities is the strength and expertise of the CAS team. Through our <br />commitment to SUE, 3D Radar and other disciplines required for underground utility design and <br />construction, CAS is the best candidate. <br /> <br />CAS is directly involved with, and intimately understands the importance of effective Utility <br />Coordination and communication with public and private utility owners and authorities. Successful <br />coordination efforts minimize project delays, construction costs, and contractor claims associated <br />with utility issues and provide for better overall project outcomes. <br /> <br />CAS has a proven record of accomplishment of engaging and involving utility owners in all phases <br />of the project process through outreach and communication. We have developed and <br />demonstrated mechanisms that support ongoing participation by all parties and we maintain strong <br />relationships and cooperation with many utility owners. Through early engagement and <br />communication with utility owners, CAS can more consistently and effectively control project <br />schedules and budgets. <br /> <br />CAS provides all levels of utility coordination, utility location and subsurface utility engineering <br />services. Through current commitments and past experiences, CAS has been tasked with <br />developing focused local coordination efforts to bring together representatives from diverse <br />functions that are involved in the utility coordination process to ensure ongoing successful <br />implementation and to maximize the benefits of the process. <br /> <br />Drawing upon our experience and relationships with the major utility owners; FPL, AT&T, <br />FPUC, Comcast and others, CAS has successfully optimized the project development <br />process with greater emphasis on early coordination efforts, consideration of existing and <br />proposed utility installations on the front end of a given project and reduced design and <br />construction time later in the project process. <br /> <br />GENERALIZED PROJECT APPROACH <br /> <br />CAS is a client oriented firm. Our philosophy is to work with the City's Staff to provide the best <br />possible services and solutions to complete the project cost effectively and within the City's <br />budget. CAS works within a team approach while making the City's Staff an integral part of the <br />team. All projects will be developed in the most cost effective project scopes to achieve successful <br />results. CAS will also investigate possibilities for outside funding of projects when at all possible. <br /> <br />CAS employs a quality assurance team throughout the project. The team meets regularly with CAS <br />staff and City staff to provide value added solutions, liability checks, and design accuracy at no extra <br />cost. We perform in-house value engineering to seek the best possible cost effective timely project <br />for the City. Our radar scanning capabilities add value specifically to road, drainage and utility <br />projects; providing added accuracy, reducing time and limiting future construction liabilities, <br />and conflicts through our Project Director and President, Gene R. Schriner's commitment to <br />perform. . <br /> <br />CRAIG A. SMITH <br />& ASSOCIATES <br /> <br />Proposer: Craig A. Smith & Associates <br /> <br />RFQ No. 11-11-02 <br /> <br />59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.