My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Robayna & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Robayna & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 10:44:02 AM
Creation date
2/9/2012 10:41:19 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r 1 <br /> <br />r 1 <br /> <br />1IIIYNft <br />AN D ASSOCIATES INC. <br />EHGlNWlS - PLAHlIERS . SURVEYORS <br /> <br />Robayna and Associates, Inc <br />City of Sunny Isles Beach <br />RFQ No, 11-11-02 <br /> <br />r 1 <br /> <br />The definition of a complete bid set of plans has developed over the last thirty years. With the <br />advent of 3D CADD software it has become more complicated yet easier to prepare plans which <br />are considered complete and consistent. <br /> <br />r 1 <br /> <br />d. Detailing elements that are to be protected, kept, repaired or removed from the road. <br />As in every project where a road is being upgraded and drainage is being retrofitted each exiting <br />element needs to be reviewed for how it fits or should fit into the future of that roadway. R&A <br />will gladly provide its recommendations to the City and its Residents relating to any element <br />within the right-of-way and based on the City's request provide a mean to protect, repair, <br />remove or replace an element. Over the years residents have become attached to certain things, <br />which may define their neighborhood and no design project should strip them of any sense of <br />individuality. <br /> <br />F 1 <br /> <br />I r I <br />I <br />i <br />I ] <br />I <br />i 1 <br />I I J <br /> <br />e. Obtaining all Permits for the City <br />During the initial conversations with the permitting agencies and when the 30% design is <br />complete a clear picture of the Permitting Agencies will be developed. This will be dependent <br />upon the design elements and will include the following Departments besides the City; Miami. <br />Dade County, FDOT, FDEP and potentially SFWMD for the outfalls unless it is delegated to <br />Miami-Dade County PERA. <br /> <br />, t <br /> <br />f. Geotechnical Information <br />R&A has complemented its services with US South Engineering and Testing Labs for numerous <br />years over countless projects. US South has had a great track record of providing and <br />coordinating its geotechnical services as needed for engineering designs in an effective manner. <br /> <br />g. Easement Acquisition <br />R&A's survey department has assisted other municipalities and the County in acqumng <br />easements and additional right-of-way since the early 80's and will be able to coordinate with <br />the project manger in defining the most practical stretch of land for the location of outfall given <br />the criteria from Miami-Dade County PERA Coastal and the City. R&A has had extensive <br />experience in bathymetric surveying, which will be needed in defining the feasibility of the <br />outfall location. <br /> <br />h. Additional Services which may be needed per Agencies. <br />Upon completion of an initial design, meetings will be coordinated with all agencies, which <br />have jurisdiction in order to define their requirements to the letter and be sure that we meet <br />the requirements through the permitting phase of the project. All meeting minutes will be <br />written and provided to the agency and the City for accountability. <br /> <br />2. Project Limits are one of the most important items to define at the start of the project; more so when <br />dealing with connections to a signalized intersection of an FDOT maintained roadway. The limits will <br />be coordinated with the City to include the location of the outfall. <br /> <br />3, Our staff and sub consultants are experienced, enthusiastic and courteous engineers and surveyors who <br />know that this is a people serving people industry. Additionally, they are dedicated to solving problems <br />for our clients not creating them. <br /> <br />4. The duty of R&A is first and foremost to The City and protecting the interests of the City and its <br />Residents though the design, permitting and construction of the project. The goal is to provide a <br />design, which is economically feasible while meeting the written requirements of the departments <br />involved. <br /> <br />5, As mentioned previously above, R&A has prepared easement surveys with legal descriptions in <br />coordination with other municipalities and the County in the past. The Survey department can work <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.