|
<br />c 1
<br />
<br />RlllYNi
<br />AND ASSOCIATES INC.
<br />EHOlNURS - Pl.AN.'lEIlS - SURVEYORS
<br />
<br />Robayna and Associates, Inc.
<br />City of Sunny Isles Beach
<br />RFQ No. 11-11-02
<br />
<br />r 1
<br />
<br />r 1
<br />
<br />Rafael L. Robayna, P.E #19453
<br />Principal in Charge / Project Manager
<br />
<br />I '1
<br />I r 1
<br />
<br />Professional Credentials
<br />· BS of Building Construction, University of Florida, 1969
<br />· Associate in Architecture, Miami Dade Community College, 1967
<br />· Professional Registrations: Professional Engineer, Florida, since 1976
<br />
<br />, I
<br />I
<br />
<br />Special Qualifications
<br />· More than 40 years of experience in Site and Urban Planning, Civil and Environmental Engineering,
<br />Highway Planning and Design, and Construction Administration.
<br />· Expertise in the internal functioning of local, state and federal governmental and regulatory agencies.
<br />The expertise enables to analyze public facilities projects based on a sound understanding of business,
<br />as well as the construction industry.
<br />· Extensive Project Manager
<br />· Experience on the data collection planning, designing and construction administration on the civil
<br />engineer field.
<br />· Managed more than 300 Land Development & Road Construction Projects.
<br />· Extensive knowledge of construction and permit standards of Miami-Dade County Agencies, South
<br />Florida Water Management District, and Florida Department of Environmental Protection.
<br />
<br />r I
<br />I
<br />. I
<br />
<br />, 1
<br />
<br />I I
<br />
<br />I ~ 1
<br />. I
<br />
<br />r I
<br />
<br />Relevant Experience
<br />Recent Projects that Mr. Robayna rolled as Principal in Charge.
<br />
<br />r I
<br />
<br />· Bonavida Condominium Association, Aventura, FI. The scope contained Surveying and Engineering
<br />services for drainage improvements of parking lot. Services include boundary and topographic survey,
<br />plans design, permitting, paving, grading and drainage design and plans preparation, pavement signing
<br />and marking. Other services in the construction phase like project administration and meetings,
<br />assistance in the selection of contractor, construction administration and field inspections, shop
<br />drawings review and final certification.
<br />
<br />· Venetian Causeway Streetscape Improvements. Miami Beach, FL. Miami Dade County PWD. Project
<br />662519- Sub consultant to Kimley-Horn and Associates. The Venetian Causeway is approximately
<br />10,560 If of roadway with a variable right-of-way. The project boundaries extend from Aiton Road to
<br />the western boundary of the City of Miami Beach and from Bayshore Drive to eastern boundary of the
<br />City of Miami. The objective of this project is to provide beautification enhancements and
<br />improvements to the Venetian Causeway. Our services included new road alignment with a curb and
<br />gutter, bicycle path and pedestrian sidewalks, storm water drainage improvements, landscape and
<br />lighting, shop drawings review.
<br />
<br />· Sweetwater Drainage, Street Improvements and Beautification - Area of Flagler Street to SW 4th St.
<br />and SW 109th Ave. to SW 114th Ave. This project consists of land surveying, planning, drainage and
<br />street design, landscaping and tree planting and plans preparation for the neighborhood street
<br />improvement, as well as construction administration and management.
<br />
<br />· Outfall Drainage Improvement Programs to SW 13ih Ave. Miami, FL. MDC DERM Project. From
<br />SW 137th Ave from Coral Way to Tamiami Trail and Coral Way (SW 26 St.) Interconnection. This
<br />project scope included several improvements to the drainage system capacity and roads
<br />interconnection. There were major deficits to the drainage system, most of it did not have sufficient
<br />capacity to handle major storms, had maintenance problems, and intersecting problem, The services
<br />provided include route survey, plans design for stormwater and drainage improvements, plans design
<br />to interconnect the individual systems along SW 1370\ Ave., permitting thru DERM, FDOT for MOT
<br />plans, utility coordination, and limited construction administration services.
<br />
<br />. ,
<br />
<br />, I
<br />
<br />I'
<br />
<br />l j
<br />
<br />38
<br />
|