My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Robayna & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Robayna & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 10:44:02 AM
Creation date
2/9/2012 10:41:19 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, 1 <br /> <br />RIBIV. <br />AND ASSOCIATES INC. <br />EHGlIEEIlS - PLAHIIERS - SURVEYORS <br /> <br />Robayna and Associates, Inc. <br />City of Sunny Isles Beach <br />RFQ No, 11-11-02 <br /> <br />rl <br /> <br />, 1 <br /> <br />@fJI( <br /> <br />u.s. SOUTH <br /> <br />r1 <br /> <br />ENGINEERING & TESTING LABORATORY, INC. <br /> <br />Environmental Department <br />14345 Commerce Way, Miami Lakes, FL 33016 <br />office: 305.556,6540 I fax 305.556.6897 <br /> <br />r 1 <br /> <br />Ghasem Khavanin, P.E. # 41955 - Geotechnical Project Engineer <br /> <br />Professional Credentials <br />- Bachelor of Science, Civil Engineering, Florida International University <br /> <br />, I <br /> <br />'I <br />I <br /> <br />Special Qualifications <br />Mr. Khavanin has over 29 years of experience and has worked on numerous mediums to large <br />environmental engineering projects for the public and private sector. His expertise includes subsurface <br />explorations, laboratory studies, geochemical design, analyses and recommendations related to the design <br />and construction of foundations elements of numerous projects, such as buildings, highways, marine <br />facilities, and underground structures. Responsibilities include day-to-day project management, <br />coordination and review of all aspects of geotechnical engineering services. Supervise, direct and evaluate <br />engineering, technicians and drillers staff perfonnance. <br /> <br />r 1 <br /> <br />l ~ 1 <br />I' I <br /> <br />l I <br /> <br />Summary of Capabilities <br />· Environmental Site Assessments <br />· Contamination Assessments <br />· Remedial Action Implementation for Petroleum <br />· Hazardous Waste and Solid Waste Contaminated Sites <br />· Asbestos Surveys and Abatement <br />· Contamination Assessment & Storage Tank Closure <br />· Lead-Based Paint Consulting <br />· Property Condition Assessments <br />· Air Quality <br />· Geotechnical Investigations <br />· Construction Material Testing, Design and Construction of Residential and Commercial Structures <br />· Pavement Design <br /> <br />, 1 <br /> <br />, , <br /> <br />, 1 <br /> <br />I J <br /> <br />l J <br /> <br />Relevant Experience <br />- Regatta II, Miami Beach FI. Sub-consultant for Robayna and Associates, Inc. Phase I Environmental Site <br />Assessment for approximately 2 Acre Residential site. <br />This Assignment consisted of the preparation of an Environmental Site Assessment in accordance with the <br />regulations of the Federal Community Development Grants, the Miami-Dade County's "Minimum <br />Requirements for Phase I Environmental Audits", and ASTM E-1527-97 "Standard Practices for <br />Environmental Site Assessments Process". Then site was field investigated, research of old documentation <br />like aerial photos and other publications as necessary, and DERM records reviewed to analyze any impact <br />to the project. Preparation of Final Environmental Report as well as, visual inspections of the accessible <br />portions and boring test performed. <br /> <br />- Egret Lakes Subdivision - Venetian Isles, Miami Fl. Sub-consultant for Robayna & Associates, Inc. <br />This project is a 127.5 acre subdivision project, with several large lakes throughout the project (mixed use <br />590 residential houses and town homes). The project required complete testing from initial design thru <br />building construction testing. Standard Penetration Test (SPT). Driving a split-barrel sampler to obtain a <br /> <br />52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.