Laserfiche WebLink
<br />r 1 <br /> <br />1IIIYNfi <br />AND ASSOCIATES INC. <br />EHGlHEERS - PLAHHERS . SURVEYORS <br /> <br />Robayna and Associates, Inc. <br />City of Sunny Isles Beach <br />RFQ No, 11-11-02 <br /> <br />, 1 <br /> <br />r1 <br /> <br />representative soil sample and a measure of the resistance of the soil to penetration of the sampler. In <br />general accordance with ASTM D1586. Soil testing and drainage exfiltration test. <br /> <br />'1 <br /> <br />-Design of 8" Water main. GOB-NC-27B Miami-Dade County W ASD. Sub-consultant for Robayna & <br />Associates, Inc. <br />The project extents for 6,200 If along SW 72 Ct. between SW 72 St and SW 66 St. and surrounding areas. <br />The professional services included environmental site assessment, Phase I and IT and limited environmental <br />site. <br /> <br />I r 1 <br />! 'I <br /> <br />-San Miguel Shopping Plaza 13910 SW 8111 St., Miami, FL Sub-consultant for Robayna & Associates, Inc. <br />This project consisted of a 70,000 SF shopping center, commercial site. The project required Geotechnical, <br />concrete, density, soil testing and drainage ex-filtration test. <br /> <br />r I <br />I <br /> <br />-Vacant Site 17141 Collins Ave. Miami Beach Fl/ Waterbrook, LLC. <br />Preparation of an Environmental Site Assessment in accordance with the South Florida regulations, field <br />investigation, aerial photos reviewed dating back 1940's from several available sources, other publications <br />reviewed as necessary, and DERM's records were also requested and reviewed in order to analyze any <br />impact to the project and prepare our final environmental report, <br /> <br />r 1 <br /> <br />- Shoma Development at Sable Palms Homestead, FL. <br />The services rendered included geotechnical report, Phase I Environmental Site Assessment in accordance <br />with the regulations of the Federal Community Development Grants, the Miami-Dade County's "Minimum <br />Requirements for Phase I Environmental Audits", and ASTM E-1527-97 "Standard Practices for <br />Environmental Site Assessments Process". <br /> <br />I ~ 1 <br />I <br />I <br />, J <br /> <br />. I <br /> <br />- Commercial Property-Rancho Okeechobee, Hialeah FI. <br />This project is a commercial property with 12,674 Sq. feet building and 1.40 Acre site. The services <br />included environmental site assessment, Phase I and limited environmental site. Then site was field <br />investigated, aerial photos were reviewed dating back 1940's from several available sources, other <br />publications were reviewed as necessary, and DERM records were also requested and reviewed in order to <br />analyze any impact to the project and prepare our final environmental report. <br /> <br />Professional Organizations <br />American Society of Civil Engineers <br /> <br />, I <br /> <br />53 <br />