My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Robayna & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Robayna & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 10:44:02 AM
Creation date
2/9/2012 10:41:19 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />r I <br /> <br />, 1 <br /> <br />RIIIYNI <br />AND ASSOCIATES INC, <br />EHGIN![llS - PLAHHERS - SURVEYORS <br /> <br />Robayna and Associates, Inc. <br />City of Sunny Isles Beach <br />RFQ No, 11-11-02 <br /> <br />, 1 <br /> <br />V. Roadwav Silmin!!:. Pavement Markin!!: and Channelization Plans <br /> <br />The Signing and Pavement Marking Plans will be prepared in accordance, the Manual on Uniform <br />Traffic Control Devies (MUTCD), Miami-Dade County and FDOT Standards. <br /> <br />r I <br /> <br />Robayna and Associates, Inc. will perform a sign inventory along the project. Signage along 1741h <br />appears to be in very good condition and shall be kept unless changes are required by the City. If <br />any sign along the roadway does not meet current standards it will be identified and replaced. <br /> <br />VI. <br /> <br />Envil'Onmental Issues <br /> <br />, 1 <br /> <br />J <br /> <br />When dealing within the Biscayne Bay ecosystem the design team must be conscious of the <br />environmental impacts that can occur at focused runoff discharge points, such as outfalls pipes. <br />The presence of endangered seagrasses and corals that are a crucial part of the marine environment <br />can be damaged during construction or as a result of system design and operation. It is crucial that <br />the flow from outfall pipes maintain certain velocities as to promote the growth and not damage <br />seagrasses. Coordination with Miami-Dade County PERA should be made when selecting the <br />location of a new outfall. The development of environmental management plans at an early stage <br />in the engineering and design process is an integral component of minimizing future project costs <br />and delays. <br /> <br />.1 <br /> <br />VII. <br /> <br />Pe.'mittin!!: <br /> <br />I <br />- j <br /> <br />Robayna and Associates, Inc will process and obtain required permit approvals. Our team has <br />been working in permitting civil engineering projects since 1981 in the South Florida area and has <br />a long track record of success and professional relations with all the regulatory agencies. <br /> <br />r 1 <br /> <br />, t <br /> <br />Our team's knowledge of the standards and permitting procedures allow us provide for the needs <br />for this specific project as describe below: <br /> <br />. , <br /> <br />1- Contact all permitting agencies involved to identify their concerns and jurisdiction early on the process <br />to avoid stumbling blocks. This will included: <br />1.1 Agencies that have direct regulating responsibility for the Road Improvements, like: <br />" Miami-Dade County Public Works and Waste Management Dept. <br />" Miami-Dade County Permitting, Environment and Regulator Affairs (PERA) <br />1.2 Agencies that have Right of Way or Property Rights Jurisdiction, like: <br />'" City of Sunny Isles Beach and Residents <br />1.3 Agencies that my have jurisdiction over affected or relocated utilities, like: <br />" Florida Power and Light Co. (electric lines) <br />'" AT&T (communication lines) <br />'" Miami-Dade County Fire Rescue Dept. <br />'" City of North Miami Beach Water Department and MD- W ASD(if relocation of their <br />utilities is required) <br />'" Gas and Cable Companies (if gas or cable lines are affected) <br />2- Preparation of permit application packages. <br />After completion of the plans permit submittal packages will be prepared, applications will be <br />filled, Close coordination with the Departments and the permitting agencies will allow for smooth <br />flow of this phase. <br />3- Submittal of Permit application package through the Agencies. Some of these reviews are internal <br />City reviews. <br />3,1 City of Sunny Isles Beach Building Department <br />3.2 City of Sunny Isles Beach Public Works <br />4- Environmental Permitting <br />This project is not located in a Drainage Basin, expected impact to surface waters (Intercostal) will <br />be affected. <br /> <br />I J <br /> <br />58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.