Laserfiche WebLink
<br />, 1 <br /> <br />1811YNa <br />AN D ASSOCIATES INC. <br />EHGIHE[ll$ - PLAICl[ll$ . SURVEYORS <br /> <br />Robayna and Associates, Inc. <br />City of Sunny Isles Beach <br />RFQ No. 11-11-02 <br /> <br />r 1 <br /> <br />, 1 <br /> <br />)> Miami-Dade County Permitting, Environment and Regulator Affairs (PERA) Coastal <br />Department <br />5- Drainage Permitting <br />In Miami-Dade County, the SFWMD has delegated permitting authority to PERA for following <br />project conditions: <br />J. No wetland impacts <br />J. Area less than 40 acres with overflow <br />). Area less than 320 acres without overflow <br />)> Located outside western C-9 basin <br /> <br />r 1 <br /> <br />~ 1 <br /> <br />The table below shows the typical permits that will be required in Miami-Dade County for projects <br />meeting the above criteria. <br /> <br />, I <br />I <br /> <br />Total Land Area Overflow Permit Required <br /><10 acres with "No Notice" permit. DERM <br /><2 acres No Environmental Review. Public Works <br />Impervious area Department (PWD) paving and <br /> drainage construction permit. <br /><10 acres Yes DERM Class II Permit <br />> 10 acres No DERM Surface General Permit PWD <br /><320 acres Drainage Construction Permit. <br /> <br />, ] <br /> <br />r I <br />I , I <br /> <br />t ' I <br /> <br />r I <br /> <br />The anticipated regulatory agencies having jurisdiction over the proposed stormwater management <br />system for this project are: <br />)> City of Sunny Isles Beach Public Works Department <br />)> Miami-Dade County PERA - Water Control Section <br />? Florida Department Environmental Protection (FDEP) <br /> <br />. J <br /> <br />I I <br /> <br />VIII. <br /> <br />Construction Administmtion Assistance and Documentation <br /> <br />. J <br /> <br />, I <br /> <br />Robayna and Associates, and US South Engineering will assist and or coordinate, as required, in <br />the bidding process, pre-construction meetings, shop drawings review and approval, field <br />inspections, review of contractor's pay requests and as-builts documents for final engineer <br />certifications as may be included in the agreement. <br /> <br />. I <br /> <br />Our capabilities combined with a depth of local experience, knowledge and resources, allow us to <br />provide The City of Sunny Isles Beach with services that are unique to our Firm and Team. These <br />qualifications and our reputation make Robayna and Associates, Inc. Team the right choice to <br />upgrade the drainage system for 174th Street. <br /> <br />Whether it is the design of roadways, bridges, buildings, drainage systems, sewage collection <br />system, or water resource projects, Robayna and Associates, Inc. has the necessary civil <br />engineering capabilities. We emphasize the importance of good initial data to achieve successful <br />projects. Robayna and Associates, Inc. takes pride in its ability to develop engineering solutions <br />within budget to satisfy our client's needs. These solutions are implemented within our frame of <br />services, which emphasizes technical innovation and high competence always coordinated with <br />our client's staff. <br /> <br />59 <br />