My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
SRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 11:05:00 AM
Creation date
2/9/2012 11:01:26 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1 <br /> <br /> <br />1 <br /> <br />~l <br /> <br />PROJECT NAME: <br /> <br />Ponce de Leon Blvd. CEI <br /> <br />CLIENT'S NAME: <br /> <br />City of Coral Gables <br />Department of Public <br />Works <br /> <br />rl <br /> <br />rl <br /> <br />TYPE OF FACILITY <br />OR SERVICES: <br /> <br />Construction Inspection <br />Services <br /> <br />SRS PROJECT FEE: <br /> <br />$ 194,663.53 <br /> <br />~l <br /> <br />COMPLETION DATE: <br /> <br />On-going <br /> <br />l <br /> <br />KEY INDIVIDUALS <br />INVOLVED: <br /> <br />Ignacio Serralta, P.E. <br />Oliverio Sanchez. P. E. <br />Ralph Pereda <br />Luis Hurtado <br /> <br />~ 1 <br /> <br />PROJECT DESCRIPTION: <br /> <br />~ ) <br /> <br />Construction administration support and inspection services <br />during the construction of Ponce de Leon Boulevard Median <br />Beautification project as required by the Department in order <br />to meet FOOT's LAP Program requirements. Scope of Work <br />included, but not limited to, the following: <br /> <br />, 1 <br />~ I <br /> <br />· Provide CEI and construction administration services as required for <br />the LAP Program. <br />· Attend pre-construction meeting and prepare minutes for distribution, <br />· Review shop drawings submitted by Contractor for adherence to <br />construction documents, <br />· Attend bi-weekly progress meetings and prepare for minutes for <br />distribution. <br />· Respond to Contractor request for information and clarification of <br />contract documents. <br />. Coordinate utility issues/conflicts. <br />· Process all construction correspondence and documents. <br />· Review and recommend Contractor payment requisitions. <br />. Review Contractor's certified payrolls, <br />· Conduct labor interviews to assure wage rate compliance. <br />Verify Contractor's Disadvantaged Business Enterprise (DBE) on- <br />going training program. <br />. Review Contractor EEO requirements. <br />· Provide On the Job Training (OJT) monitoring and reporting. <br />· Review and recommend Contractor change order requests, if any. <br />. Provide full-time inspector (40 hours per week), <br />· Conduct semi-final inspection and prepare punch list. <br />· Conduct final inspection, punch list, and contract close-out. <br />· QAJQC - limited materials and density testing Provide independent <br />assurance testing and coordinate with testing lab to obtain sampling <br />and testing, Compare test results and document in project records. <br />· Provide photo history of project in digital format. <br />· Other construction phase engineering services as requested by <br />the Department. <br />. Construction cost $1,816,772.42 <br /> <br />~ I <br /> <br />I 1 <br />l J <br /> <br />r'l <br /> <br />l J <br /> <br />1 <br />~ J <br /> <br />l j <br /> <br />l j <br /> <br />'. , <br /> <br />, J <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.