My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CIMA
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
CIMA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 11:08:58 AM
Creation date
2/9/2012 11:06:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs.
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SW 56 St. from SW 67 Ave. to SW 57 Ave. - Miami-Dade County Public Works; Mr. Caamano was <br />the Senior Design Engineer responsible for the coordination, design and preparation of construction <br />documents for the modification of 1 miles of SW 56th Street from an existing 2-lane undivided roadway to <br />a 4-lane divided roadway. This project included modifying roadway alignments, utility coordination, and <br />drainage, culvert crossing expansion, signing and marking, street lighting and coordination with SFWMD, <br />DERM, and MDWASD. This actual project never got built by the County due to protest by the affected <br />residents abutting the roadway. The project was shelved to this day. <br /> <br />l <br />1 <br />~ 1 <br />~1 <br />rl <br />~) <br />~ 1 <br />~ ] <br />; :] <br /> <br />I <br />I <br /> <br />Request for Qualifications No. 11-11-02 <br /> <br />NW 12 St. from NW 97 Ave. to NW 102 Ave. Developer <br />Donation Project to MDPW;Mr. Caamano was the Senior <br />Design Engineer responsible for the coordination, design and <br />preparation of construction documents for the new construction <br />of 'Y2 mile of NW 1 ih Street from vacant land to a 4-lane divided <br />roadway. This project included modifying roadway alignments <br />for the north leg of NW 97 Ave at NW 12 Street, utility <br />coordination, drainage, signing and marking, and coordination <br />with SFWMD, DERM, MDWASD, and CSX Railroad. <br /> <br />SW 137 Ave. from SW 120 St. to SW 88 St. - Miami-Dade <br />County Public Works; Mr. Caamano was the Senior Design <br />Engineer responsible for the coordination, design and <br />preparation of construction documents for the modification of 2 <br />miles of SW 13ih Avenue from an existing 2-lane undivided <br />roadway to a 6-lane divided roadway. This project included <br />modifying roadway alignments, utility coordination, drainage, <br />two signalized intersections, signing and marking, street lighting <br />and coordination with FOOT, SFWMD, DERM, and MDWASD <br /> <br />, J <br />: L J <br /> <br />I ' I <br />. J <br /> <br />, I <br /> <br />I J <br /> <br />I <br />I I <br /> <br />; I I <br /> <br />I <br />I l I <br />I <br /> <br />l I <br /> <br />l I <br /> <br />, J <br /> <br />C 1tJ\A. <br /> <br /> <br /> <br />, J <br /> <br />II C! M A', Q u a.11 II '"'ti .'n ,. <br /> <br />II:. ,':, ~ag~:!.f5]1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.