My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CIMA
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
CIMA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 11:08:58 AM
Creation date
2/9/2012 11:06:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs.
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />fl <br />rl <br />~l <br />~l <br />~ 1 <br />r 1 <br />~ I <br />~ ) <br />1 r.1 <br />I 1 J <br />I 1 <br />1 J <br />I <br />: ~ I <br /> <br />Request for Qualifications No. 11-11-02 <br /> <br />SW 42 St (Bird Rd), from SW 147 Ave to SW 152 Ave.- <br />Miami-Dade County Public Works; <br /> <br />Mr. Caamano was the Design Project Manager responsible for <br />the coordination, design and preparation of construction <br />documents for the reconstruction of Bird Rd. This project <br />included roadway alignments coordination, utility coordination, <br />drainage, signing and marking, and Street lighting. This project <br />although short in distance provided a unique typical section <br />requirements due to an existing canal section adjacent to the <br />roadway and a fast track design requirement due to political <br />pressure from neighboring residents looking for the final <br />completion of this portion of roadway never provided during the <br />development of the region. <br /> <br />Grand Ave, from SW 37 Ave to SW 32 Ave. - City of Miami <br />Public Works & Miami-Dade County Public Works (JPA); Mr. <br />Caamano was the Senior Design Engineer responsible for the <br />coordination, design and preparation of construction documents <br />for the reconstruction of 1/2 mile of Grand Ave. This project <br />included roadway alignments coordination, utility coordination, <br />drainage, signing and marking, street lighting and signal design. <br />This one/half mile design project was a very congested urban <br />area with multiple store fronts to be accommodated by the <br />design of the roadway. <br /> <br />I , I <br /> <br />I I <br /> <br />I : I <br /> <br />NW 107 Ave. from NW 41 St. to NW 53 St. - Developer <br />Donation Project to MDPW; Mr. Caamano was the Senior <br />Design Engineer responsible for the coordination, design and <br />preparation of construction documents for the new construction <br />of ~ mile of NW 1 07'h Avenue from vacant land to a 4-lane <br />divided roadway. This project included modifying roadway <br />alignments for the south leg of SW 107 Ave at NW 41 Street, <br />utility coordination, drainage, signing and marking, and <br />coordination with SFWMD, DERM, and MDWASD. <br /> <br />I II <br /> <br />I l I <br />I <br />I <br /> <br />l I <br /> <br />,. J <br /> <br />I I j <br /> <br />I ' J <br />I <br /> <br />I elM A's Qua Ii fie a t i 0 n~s <br /> <br />C 1tJ\A. <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.