My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CIMA
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
CIMA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 11:08:58 AM
Creation date
2/9/2012 11:06:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs.
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />l <br />l <br />~1 <br />~l <br />~ 1 <br />~1 <br />~l <br />: ] <br />: 1 <br />~ I <br /> <br /> <br />I <br /> <br /><I <br /> <br />Request for Qualifications No. 11-11-02 <br /> <br />US-1 from SW 288 ST to SW 264 St. FOOT Project <br />T6192, JPA with Miami-Dade Water & Sewer, Miami, <br />Florida; CIMA was the QC Inspectors for Trans Florida <br />Development (the contractor) and Mr. Caamano was the <br />Project Manager for the Contractor. This project was a <br />Joint participation between Miami-Dade Water & Sewer <br />and the FOOT for the reconstruction of US-1 and the <br />installation of a 24" water main along the entire project. <br />The roadway reconstruction included a complete <br />continuous drainage system, Bridge widening, street <br />lighting and signal modifications. <br /> <br />Perimeter Rd - NW 72 Ave to NW 57 Ave, FOOT Project <br />T6174, Miami, Florida; CIMA was the CEI Consultant to <br />FOOT and Trans Florida Development was the contractor. <br />Mr. Caamano was the Project Manager for the Contractor. <br />This project was a fast track project as part of the future <br />interchange of SR 836 and SR 826 reconstruction. The <br />roadway reconstruction included a complete continuous <br />drainage system, Bridge demolition and culvert <br />construction, street lighting and signal modifications. <br />Specifically this project involved the relocation of the Miami <br />International Airport fence along the south side of the <br />facility and the rework of their existing drainage in the <br />region. The project was completed ahead of schedule and <br />under budget. <br /> <br />I r I <br /> <br />l , I <br />i <br /> <br />I , I <br />I <br />I L I <br />I <br /> <br />SW 160 St Miami-Dade County Project 20070682, <br />Miami, Florida; Mr. Caamano was the Construction <br />Project Manager for the Contractor. This project consisted <br />of the construction of the new roadway and new drainage, <br />bridge widening, new street lighting and new traffic <br />signalization. The Project required his supervision on the <br />daily operation of the project, coordination with the <br />agencies and the Design Engineers, the subcontractors <br />and the County. Managing all purchasing, invoicing and <br />reporting on field problems and providing or working out <br />solutions for each scenario. <br /> <br />1 <br />I <br /> <br />\ I <br /> <br />I <br />I <br />.. I <br /> <br />l I <br /> <br />. J <br /> <br />. I <br /> <br />i ' I <br /> <br />I CIMA's Q'\~alifica1t'io'm's <br /> <br />C 1tJ\A. <br /> <br /> <br />~ ~ <br /> <br /> <br /> <br /> <br />-<' , '<~- <br />. ,Page"5 of,5 <br />,j~:t~, <br />
The URL can be used to link to this page
Your browser does not support the video tag.