<br />JOSE A. GONZALEZ, P .E.
<br />SENIOR ENGINEER / SENIOR PROJECT MANAGER
<br />(22 YEARS OF EXPERIENCE)
<br />
<br />~l
<br />
<br />~
<br />,
<br />"
<br />,". ../.., .
<br />
<br />--
<br />
<br />~l
<br />
<br />DEGREES:
<br />Bachelor of Science in Civil Engineering, Florida International University, 1989
<br />
<br />~ J
<br />
<br />LICENSES:
<br />
<br />Certified Professional Engineer in Florida, License No, 47519
<br />Certified General Contractor in Florida, License No, CGC 1505020
<br />Certified Under Ground Contractor in Florida, License No. CUC 1223853
<br />Miami-Dade County Structural Engineer Contractor
<br />
<br />r 1
<br />
<br />. J
<br />
<br />CTQP CERTIFICATIONS:
<br />Tin No. G524421644410
<br />Asphalt Roadway I & II, Asphalt Plant II, Earthwork I & II, QC Manager, Drill Shaft, Final Estimates Level 2
<br />
<br />r 1
<br />I I
<br />
<br />OTHER TRAINING:
<br />
<br />A TTSA: MOT Advanced, Troxler: Radiation Safety Officer
<br />FDOT: Final Estimates, Claims Review, Site Manager, L1MS, TSO, IMS
<br />
<br />~ 1
<br />
<br />I 1
<br />
<br />EXPERIENCE:
<br />FEBRUARY 2010 TO MARCH 2011
<br />Senior Project Engineer for Seminole Tribe of Florida's $2.3 million Snake Road and Bridge Project Reconstruction of
<br />BIA Route 1281 bridge and approaches and utilities. Director of Transportation Richard Pereira (954) 985-2300
<br />
<br />I J
<br />
<br />I J
<br />
<br />JUNE 2009 TO JUNE 2010
<br />Senior Project Engineer on the $4.9 million Perimeter Road reconstruction project from NW 72nd Avenue to NW 57th
<br />Avenue. Project includes construction of a four lane road south of the Miami International Airport which includes installation of
<br />a 120" culvert crossing the Venetian canal. Project also involves coordination with MIA, TSA, FAA, CSX and Contamination
<br />abatement. Client: FDOT D6 Project Manager: Isa Nunez (305) 499-2370
<br />
<br />r 1
<br />
<br />I I
<br />
<br />L I
<br />
<br />JANUARY 2009 TO AUGUST 2010
<br />Construction Manager for City of Fort Lauderdale, Fire Stations #29, #49, and #3, Responsible for review of project
<br />schedules, analyzing change orders, overview of construction procedures and policies, and construction contract
<br />interpretation of the three stations totaling $6,8 million in construction costs. Project Manager: Mark Friedman, AlA
<br />(954) 828-5952.
<br />
<br />DECEMBER 2007 TO DECEMBER 2008
<br />Senior Project Engineer for the $4,2 million SR-823/Red Road (2,0 Miles) and $2.5 million SR-823/Flamingo Road (1.3 Miles)
<br />reconstruction project, including the milling and resurfacing of the roadway with FC-5, guardrail, stripping, and signage
<br />improvements (413837-1-52-01) and (413834-1-52-01), Client: FDOT District IV, Project Manager: Rudi Batz (954) 958-7642
<br />
<br />, I
<br />
<br />I J
<br />
<br />I J
<br />
<br />L J
<br />
<br />JANUARY 2006 TO MARCH 2007
<br />Senior Project Engineer on the following projects for FDOT District IV, Project Manager: Rudi Batz (954) 958-7642
<br />
<br />I I
<br />
<br />. SR-862 (1-595) Pine Island Road to Davie Rd, (2,7 Miles) reconstruction project; a $4,9 million project involving the
<br />milling and resurfacing with FC-5, guardrail, stripping, and signage improvements (Fin: 411323-1-52-01).
<br />. SR-9 (1-95) Southbound ramp at Hollywood Boulevard (0.4 Miles), a $1.4 million reconstruction project (Fin. 409127-
<br />1-52-01 ),
<br />. SR-9 (1-95) Southbound ramp at Griffin Road (0.3 Miles), a $1.3 million reconstruction project involving the milling
<br />and resurfacing with FC-6, new signalization, lighting, roadway widening, drainage, stripping, and signage
<br />improvements (Fin, 412202-1-52-01),
<br />
<br />I J
<br />
<br />l I
<br />
<br />JUNE 2004 TO JANUARY 2006
<br />Senior Project Engineer for the $6.4 million SR-817 (University Drive) reconstruction project from SR-84 to SR-842 (1.4
<br />Miles). This project involves milling and resurfacing with FC-6, new signalization, lighting, roadway widening, landscaping,
<br />drainage, overhead structures, stripping, and signage improvements (Fin 229079-1-52-01), Client: FDOT District IV, Project
<br />Manager: Rudi Batz (954) 958-7642
<br />
<br />L I
<br />
<br />Resume of Jose A. Gonzalez