Laserfiche WebLink
'1 <br /> <br />\1.01 <br /> <br /> <br />~l <br /> <br />JOSE A. GONZALEZ, P .E. <br />SENIOR ENGINEER / SENIOR PROJECT MANAGER <br />(22 YEARS OF EXPERIENCE) <br /> <br />~l <br /> <br />~ <br />, <br />" <br />,". ../.., . <br /> <br />-- <br /> <br />~l <br /> <br />DEGREES: <br />Bachelor of Science in Civil Engineering, Florida International University, 1989 <br /> <br />~ J <br /> <br />LICENSES: <br /> <br />Certified Professional Engineer in Florida, License No, 47519 <br />Certified General Contractor in Florida, License No, CGC 1505020 <br />Certified Under Ground Contractor in Florida, License No. CUC 1223853 <br />Miami-Dade County Structural Engineer Contractor <br /> <br />r 1 <br /> <br />. J <br /> <br />CTQP CERTIFICATIONS: <br />Tin No. G524421644410 <br />Asphalt Roadway I & II, Asphalt Plant II, Earthwork I & II, QC Manager, Drill Shaft, Final Estimates Level 2 <br /> <br />r 1 <br />I I <br /> <br />OTHER TRAINING: <br /> <br />A TTSA: MOT Advanced, Troxler: Radiation Safety Officer <br />FDOT: Final Estimates, Claims Review, Site Manager, L1MS, TSO, IMS <br /> <br />~ 1 <br /> <br />I 1 <br /> <br />EXPERIENCE: <br />FEBRUARY 2010 TO MARCH 2011 <br />Senior Project Engineer for Seminole Tribe of Florida's $2.3 million Snake Road and Bridge Project Reconstruction of <br />BIA Route 1281 bridge and approaches and utilities. Director of Transportation Richard Pereira (954) 985-2300 <br /> <br />I J <br /> <br />I J <br /> <br />JUNE 2009 TO JUNE 2010 <br />Senior Project Engineer on the $4.9 million Perimeter Road reconstruction project from NW 72nd Avenue to NW 57th <br />Avenue. Project includes construction of a four lane road south of the Miami International Airport which includes installation of <br />a 120" culvert crossing the Venetian canal. Project also involves coordination with MIA, TSA, FAA, CSX and Contamination <br />abatement. Client: FDOT D6 Project Manager: Isa Nunez (305) 499-2370 <br /> <br />r 1 <br /> <br />I I <br /> <br />L I <br /> <br />JANUARY 2009 TO AUGUST 2010 <br />Construction Manager for City of Fort Lauderdale, Fire Stations #29, #49, and #3, Responsible for review of project <br />schedules, analyzing change orders, overview of construction procedures and policies, and construction contract <br />interpretation of the three stations totaling $6,8 million in construction costs. Project Manager: Mark Friedman, AlA <br />(954) 828-5952. <br /> <br />DECEMBER 2007 TO DECEMBER 2008 <br />Senior Project Engineer for the $4,2 million SR-823/Red Road (2,0 Miles) and $2.5 million SR-823/Flamingo Road (1.3 Miles) <br />reconstruction project, including the milling and resurfacing of the roadway with FC-5, guardrail, stripping, and signage <br />improvements (413837-1-52-01) and (413834-1-52-01), Client: FDOT District IV, Project Manager: Rudi Batz (954) 958-7642 <br /> <br />, I <br /> <br />I J <br /> <br />I J <br /> <br />L J <br /> <br />JANUARY 2006 TO MARCH 2007 <br />Senior Project Engineer on the following projects for FDOT District IV, Project Manager: Rudi Batz (954) 958-7642 <br /> <br />I I <br /> <br />. SR-862 (1-595) Pine Island Road to Davie Rd, (2,7 Miles) reconstruction project; a $4,9 million project involving the <br />milling and resurfacing with FC-5, guardrail, stripping, and signage improvements (Fin: 411323-1-52-01). <br />. SR-9 (1-95) Southbound ramp at Hollywood Boulevard (0.4 Miles), a $1.4 million reconstruction project (Fin. 409127- <br />1-52-01 ), <br />. SR-9 (1-95) Southbound ramp at Griffin Road (0.3 Miles), a $1.3 million reconstruction project involving the milling <br />and resurfacing with FC-6, new signalization, lighting, roadway widening, drainage, stripping, and signage <br />improvements (Fin, 412202-1-52-01), <br /> <br />I J <br /> <br />l I <br /> <br />JUNE 2004 TO JANUARY 2006 <br />Senior Project Engineer for the $6.4 million SR-817 (University Drive) reconstruction project from SR-84 to SR-842 (1.4 <br />Miles). This project involves milling and resurfacing with FC-6, new signalization, lighting, roadway widening, landscaping, <br />drainage, overhead structures, stripping, and signage improvements (Fin 229079-1-52-01), Client: FDOT District IV, Project <br />Manager: Rudi Batz (954) 958-7642 <br /> <br />L I <br /> <br />Resume of Jose A. Gonzalez <br /> <br />Page 1 of 2 <br />