|
<br />r 1
<br />
<br />l
<br />
<br />
<br />~r""F~__'''''f. ,~'",
<br />--- ;: ~ .~4";'" ~ -,'
<br />,.."t'""" ... '!j" ;~''.,.-~,. ,11
<br />IIiii _,,;..~ '.'J:" ,)0"0" '-tl ,,' -' I r.: ."
<br />- ",.~.., ,-"" .,", ~,. ;"" ]i,i....
<br />J.;;/Ji...~1;,..~ .... - .... ,- _ 1'> "
<br />
<br />
<br />~
<br />
<br />".ClbM
<br />
<br />, -
<br />
<br />~ 11_]
<br />...... .~... ....
<br />
<br />-[
<br />......
<br />
<br />~l
<br />
<br />MARCH 2003 TO JUNE 2004
<br />Project Engineer for the $36 million MDX 836-12 Design Build Project (Turnpike Flyover) for Westbound SR-836 to the
<br />Florida Turnpike (2 Miles). This project involved heavy bridge work, roadway reconstruction, drainage, asphalt pavement,
<br />lighting, landscaping and overhead structures. Responsibilities included CEI oversight over design- builder, quality control
<br />and project management. Client: Miami-Dade Expressway Authority, Project Manager: Valentine Onuigbo (305) 637 -3277
<br />
<br />~ 1
<br />
<br />NOVEMBER 2002 TO MARCH 2003
<br />Multiple Civil projects performing CQC, Design and Construction,
<br />
<br />~l
<br />
<br />DECEMBER 2001 TO NOVEMBER 2002
<br />Senior Project Engineer for the $5,5 million SR-932 (Coral Way) milling and resurfacing project between 37th Avenue and
<br />12th Avenue (4.0 miles). This project involved milling and resurfacing with FC-6, new signalization, lighting, roadway repairs,
<br />root barrier curb, tree trimming, stripping, and signage improvements (Project No. 250230-1-52-01), Client: FOOT District VI,
<br />Project Manager: Saud Khan (305) 499-2370
<br />
<br />: 1
<br />
<br />~ 1
<br />
<br />JULY 2000 TO DECEMBER 2001
<br />Founded CIMA Engineering Corp. and worked on various Civil projects performing project management.
<br />
<br />~ 1
<br />
<br />JULY 1999 TO JULY 2000
<br />FOOT - Senior Project Engineer for several District VI construction projects, Project Manager: Ali AI-Said (305) 499-2370
<br />. 1-75 Southbound Reconstruction at NW 138 Street (Project No. 251694-1-52-01),
<br />. SR-836 Bridge Rehabilitation over CSX/FEC Railway (Project No. 2500381-1-52-01).
<br />. County Wide Overhead Structures (Project No. 250639-1-52-01).
<br />. 1-95 Southbound ramp reconstruction at Miami Gardens Drive (Project No. 250207-1-52-01),
<br />
<br />~ I
<br />
<br />MARCH 1999 TO JULY 1999
<br />Dade Transportation Consultants - GEC for Miami Dade Expressway Authority responsible for development of construction
<br />program along with development of design-build RFP's, Client: MDX Authority, Director of Engineering: Samuel Gonzalez
<br />(305) 637-3277
<br />
<br />AUGUST 1994 TO MARCH 1999
<br />FOOT - Senior Project Engineer for several FDOT District IV construction projects which were enhancements to different
<br />municipalities in Broward County, Florida. These enhancements involved the construction of sidewalks, bike paths, drainage,
<br />signing and signalization improvements totaling $6,0 million (Project No's. 86000-3521/3518/3519/3524/3620/3640; 86220-
<br />3516/3517; 86014-3509). Client: FOOT District IV, Project Manager: James Jeffers (954)776-4300
<br />
<br /><1
<br />
<br />IJ
<br />
<br />: I
<br />
<br />TREN URBANO - Resident Engineer for Phase 1 of a $150 million light rail project in San Juan, Puerto Rico called Tren
<br />Urbano. Responsible for the construction of two train stations, a maintenance and facilities building, A-7 material
<br />embankments, the construction of three low-level bridges, QC on the three concrete plants, QC on one pre-stress pile plant,
<br />and QC on one pre-stress box girder plant. Client: Roadway Authority of Puerto Rico, Project Manager: Humberto Reynolds
<br />
<br />r 1
<br />I
<br />I j
<br />
<br />FOOT - Project Engineer for a $7.7 million reconstruction of the six lane Bird Road roadway (appx, 3.0 miles), an F.D.O.T.
<br />District VI project. Project included drainage, sub-grade, limerock, foundations, asphalt, lighting, and signalization
<br />improvements (Project No 87044-3501), 1997 Recipient of FOOTs Best Urban Road Project, Client: FOOT District VI,
<br />Project Manager: Khaled AI-Said (305)499-2370
<br />
<br />AUGUST 1991 TO AUGUST 1994
<br />FOOT - Office Engineer for District VI projects; responsible for tracking daily quantities, preparation of supplemental agreements,
<br />monthly progress estimates, materials certification, assisting resident engineer and final estimates, Client: FOOT District VI, Project
<br />Manager: Khaled AI-Said (305)499-2370
<br />
<br />L I
<br />
<br />L J
<br />
<br />I
<br />I
<br />. J
<br />
<br />. Inspector for Turkey Lake Plaza Liner Containment System and structural steel installation.
<br />. Tamiami Trail Reconstruction (Project No. 87120-3534), a 1,8 mile, $5.4 million project.
<br />. Tamiami Trail Widening and Resurfacing (Project No. 87110-3507), a 4,0 mile, $2,0 million project.
<br />. Tamiami Trail Widening and Resurfacing (Project No, 87110-3506), an 11.2 mile, $4,5 million project.
<br />. Krome Avenue Widening and Resurfacing (Project No, 87150-3530), an 8,0 mile, $2.8 million project.
<br />
<br />, j
<br />
<br />JULY 1989 TO AUGUST 1991
<br />Florida Department of Transportation District VI Miami, Florida
<br />Florida Department of Transportation District VI, Professional Engineer Trainee
<br />
<br />, J
<br />
<br />Resume of Jose A. Gonzalez
<br />
<br />Page 2 of 2
<br />
<br />I'
<br />I
<br />I
<br />
|