Laserfiche WebLink
<br />r 1 <br /> <br />l <br /> <br /> <br />~r""F~__'''''f. ,~'", <br />--- ;: ~ .~4";'" ~ -,' <br />,.."t'""" ... '!j" ;~''.,.-~,. ,11 <br />IIiii _,,;..~ '.'J:" ,)0"0" '-tl ,,' -' I r.: ." <br />- ",.~.., ,-"" .,", ~,. ;"" ]i,i.... <br />J.;;/Ji...~1;,..~ .... - .... ,- _ 1'> " <br /> <br /> <br />~ <br /> <br />".ClbM <br /> <br />, - <br /> <br />~ 11_] <br />...... .~... .... <br /> <br />-[ <br />...... <br /> <br />~l <br /> <br />MARCH 2003 TO JUNE 2004 <br />Project Engineer for the $36 million MDX 836-12 Design Build Project (Turnpike Flyover) for Westbound SR-836 to the <br />Florida Turnpike (2 Miles). This project involved heavy bridge work, roadway reconstruction, drainage, asphalt pavement, <br />lighting, landscaping and overhead structures. Responsibilities included CEI oversight over design- builder, quality control <br />and project management. Client: Miami-Dade Expressway Authority, Project Manager: Valentine Onuigbo (305) 637 -3277 <br /> <br />~ 1 <br /> <br />NOVEMBER 2002 TO MARCH 2003 <br />Multiple Civil projects performing CQC, Design and Construction, <br /> <br />~l <br /> <br />DECEMBER 2001 TO NOVEMBER 2002 <br />Senior Project Engineer for the $5,5 million SR-932 (Coral Way) milling and resurfacing project between 37th Avenue and <br />12th Avenue (4.0 miles). This project involved milling and resurfacing with FC-6, new signalization, lighting, roadway repairs, <br />root barrier curb, tree trimming, stripping, and signage improvements (Project No. 250230-1-52-01), Client: FOOT District VI, <br />Project Manager: Saud Khan (305) 499-2370 <br /> <br />: 1 <br /> <br />~ 1 <br /> <br />JULY 2000 TO DECEMBER 2001 <br />Founded CIMA Engineering Corp. and worked on various Civil projects performing project management. <br /> <br />~ 1 <br /> <br />JULY 1999 TO JULY 2000 <br />FOOT - Senior Project Engineer for several District VI construction projects, Project Manager: Ali AI-Said (305) 499-2370 <br />. 1-75 Southbound Reconstruction at NW 138 Street (Project No. 251694-1-52-01), <br />. SR-836 Bridge Rehabilitation over CSX/FEC Railway (Project No. 2500381-1-52-01). <br />. County Wide Overhead Structures (Project No. 250639-1-52-01). <br />. 1-95 Southbound ramp reconstruction at Miami Gardens Drive (Project No. 250207-1-52-01), <br /> <br />~ I <br /> <br />MARCH 1999 TO JULY 1999 <br />Dade Transportation Consultants - GEC for Miami Dade Expressway Authority responsible for development of construction <br />program along with development of design-build RFP's, Client: MDX Authority, Director of Engineering: Samuel Gonzalez <br />(305) 637-3277 <br /> <br />AUGUST 1994 TO MARCH 1999 <br />FOOT - Senior Project Engineer for several FDOT District IV construction projects which were enhancements to different <br />municipalities in Broward County, Florida. These enhancements involved the construction of sidewalks, bike paths, drainage, <br />signing and signalization improvements totaling $6,0 million (Project No's. 86000-3521/3518/3519/3524/3620/3640; 86220- <br />3516/3517; 86014-3509). Client: FOOT District IV, Project Manager: James Jeffers (954)776-4300 <br /> <br /><1 <br /> <br />IJ <br /> <br />: I <br /> <br />TREN URBANO - Resident Engineer for Phase 1 of a $150 million light rail project in San Juan, Puerto Rico called Tren <br />Urbano. Responsible for the construction of two train stations, a maintenance and facilities building, A-7 material <br />embankments, the construction of three low-level bridges, QC on the three concrete plants, QC on one pre-stress pile plant, <br />and QC on one pre-stress box girder plant. Client: Roadway Authority of Puerto Rico, Project Manager: Humberto Reynolds <br /> <br />r 1 <br />I <br />I j <br /> <br />FOOT - Project Engineer for a $7.7 million reconstruction of the six lane Bird Road roadway (appx, 3.0 miles), an F.D.O.T. <br />District VI project. Project included drainage, sub-grade, limerock, foundations, asphalt, lighting, and signalization <br />improvements (Project No 87044-3501), 1997 Recipient of FOOTs Best Urban Road Project, Client: FOOT District VI, <br />Project Manager: Khaled AI-Said (305)499-2370 <br /> <br />AUGUST 1991 TO AUGUST 1994 <br />FOOT - Office Engineer for District VI projects; responsible for tracking daily quantities, preparation of supplemental agreements, <br />monthly progress estimates, materials certification, assisting resident engineer and final estimates, Client: FOOT District VI, Project <br />Manager: Khaled AI-Said (305)499-2370 <br /> <br />L I <br /> <br />L J <br /> <br />I <br />I <br />. J <br /> <br />. Inspector for Turkey Lake Plaza Liner Containment System and structural steel installation. <br />. Tamiami Trail Reconstruction (Project No. 87120-3534), a 1,8 mile, $5.4 million project. <br />. Tamiami Trail Widening and Resurfacing (Project No. 87110-3507), a 4,0 mile, $2,0 million project. <br />. Tamiami Trail Widening and Resurfacing (Project No, 87110-3506), an 11.2 mile, $4,5 million project. <br />. Krome Avenue Widening and Resurfacing (Project No, 87150-3530), an 8,0 mile, $2.8 million project. <br /> <br />, j <br /> <br />JULY 1989 TO AUGUST 1991 <br />Florida Department of Transportation District VI Miami, Florida <br />Florida Department of Transportation District VI, Professional Engineer Trainee <br /> <br />, J <br /> <br />Resume of Jose A. Gonzalez <br /> <br />Page 2 of 2 <br /> <br />I' <br />I <br />I <br />