My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 2:12:13 PM
Creation date
2/9/2012 2:09:32 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />J <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />---} <br />) <br />) <br />) <br />- ) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />{ !:N~~!idJ~! <br /> <br />AXIS - REASONABLE ASSURANCE REPORTI <br />CONSTRUCTION DEWATERING PERMITTING <br /> <br />LOCATION: <br />Miami, Florida <br /> <br />CLIENT: <br />BCRE Brickell, LLC <br /> <br />KEY PERSONNEL: <br />Daniel Spector <br />Vincent Yarina <br /> <br /> <br /> <br /> <br /> <br />.' <br />!>- <br /> <br />..,.. <br />....$. <br /> <br />...;.':. <br /> <br /><... <br /> <br />.c <br /> <br />Langan provided the following hydrogeological services <br />for this project: a Reasonable Assurance Report to satisfy <br />the requirements of Chapter 62-528, Florida <br />Administrative Code, for permitting of Class V, Group 6 <br />underground injection control wells for deep injection of <br />stormwater runoff; and groundwater modeling in support <br />of a permit application to use the drainage wells for <br />temporary construction dewatering. Langan worked with <br />Technos, Inc. and supervised the logging of a 100-ft-deep <br />test hole using geophysical techniques (induction <br />conductivity, neutron, and gamma-gamma). Langan <br />provided a Reasonable Assurance Report with a <br />recommended well casing depth. The Florida Department <br />of Environmental Protection approved the minimum casing <br />depth of 100 ft below land surface. Langan also <br />developed a groundwater flow model including mud flow <br />for the surficial aquifer and demonstrated that the <br />construction dewatering would not draw in contamination <br />from sites within one quarter mile of the project site. <br /> <br />Langan completed the project on schedule and under <br />budget. <br /> <br />Page 2116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.