My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 2:12:13 PM
Creation date
2/9/2012 2:09:32 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />--J <br />) <br />) <br />) <br />r ) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />{ - '=Nt!~!i1/~! <br /> <br />DEERING BAY COUNTRY CLUB - HYDROGEOLOGIC SERVICES <br /> <br />Langan conducted a forensic investigation to determine <br />why two lake-lowering discharge wells were not operating <br />CLIENT: at capacity, The system consisted of pumping from on-site <br />- Deering Bay-Yacht-and Gountry Glub- -Iakes-into-drainage wells,- The investigation-included <br />reviewing and interpreting geologic logs, evaluating well <br />construction logs, and collecting and evaluating hydrologic <br />data for the ponds and for Biscayne Bay, Through its <br />research Langan determined that the wells were <br />improperly constructed and not permitted and the well <br />capacities were too low for the volume of water being <br />pumped from the lake. <br /> <br />LOCATION: <br />Coral Gables, Florida <br /> <br />KEY PERSONNEL: <br />Daniel Spector <br />Vincent Varina <br /> <br /> <br />Langan investigated suitable zones for injection of <br />untreated lake water and also investigated the quality of <br />the discharge water. The investigation revealed suitable <br />injection/production zones below 75 feet and Langan <br />redesigned the production well to be more appropriate for <br />the expected volumes. <br /> <br />As part of the permitting of this well, Langan investigated <br />the lateral continuity of a semi-confining layer above the <br />untreated production zones, Langan's work on this project <br />allowed the client to realize a significant cost savings in <br />water treatment and avoid potential long-term fines for <br />violations of Florida Statutes. <br /> <br /> <br />Page 2117 <br />
The URL can be used to link to this page
Your browser does not support the video tag.