Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />: ~L\' ':if Calvin. Giordano & Associates. Inc. <br />;~~ jEXCEPTlONAL SOLlITIONS <br />..,.- ~ ]" <br />. <br /> <br />Jenna Chamberlain, PE, Page 2 <br /> <br />SR 820/Pines Boulevard, Broward County, Florida. Roadway design including adding an additional <br />through lane, adjusting medians, adding bus bays, drainage modifications, ADA upgrades and milling and <br />resurfacing. Signing and pavement marking design for Pines Boulevard including reconfiguration of two <br />mall entrances. Overall project coordination including preparing roadway and signing and pavement <br />marking plans, calculating quantities using Geopak, participating in QA/QC process, engineering during <br />_ construction, and project close out. This project included multiple projects and funding sources extending <br />from 136th Avenue to Douglas Road, funding included a LAP project, a-JPA project,and per-mifProject. <br />FDOT Project Manager: John Thompson (954) 777-4680. (2004-2008) <br /> <br />SR 7/SR 441 Safety Improvements, Fort Lauderdale, Florida. Involved in QA/QC process, electronic <br />delivery for production complete, sign panel design, signing and pavement markings plans, and post design <br />services. FDOT Project Manager: Ronald Wallace (954) 777-4641. (2005-2007) <br /> <br />SR 820/Pines Boulevard at the 1-75 interchange urbanization and ramp realignment (LAP), <br />Broward County, Florida. Signing and pavement marking design for the reconfiguration of the 1- 7 5 <br />interchange at Pines Boulevard/SR 820 including new ramp alignment, design of cantilever signs, and new <br />signalized intersections. Prepared signing and pavement marking plans, calculated quantities using <br />Geopak, participated in QA/QC process for roadway and signalization plans, and post-design services. <br />FDOT Client Liaison: Leslie Wetherell (954) 777-4438. (2007 - Currently under construction) <br /> <br />SR-93/Alligator Alley milling, resurfacing and shoulder widening, Broward County, Florida. Signing <br />and pavement marking design for toll plaza within project limits as well as participation in quality control <br />for roadway and signing and pavement marking plans. Calculated quantities coordinated all plan <br />components including landscape, structural, and geotechnical" successfully completed all electronic <br />delivery submittals of plans to FDOT District 4, and provided extensive coordination with adjacent project, <br />which was let under the same contract. FDOT Project Manager: Ronald Wallace (954) 777-4641. (2006 - <br />Currently under construction) <br /> <br />Hiatus Road at SR 820/Pines Boulevard intersection improvements, Pembroke Pines, Florida. <br />Prepared roadway and signing and pavement marking plans for the addition of dual left turn lanes on <br />Hiatus Road, both NB and SB approaches to Pines Boulevard. Coordination with BCTED, signalization sub- <br />consultant, the City of Pembroke Pines, and the FDOT for successful permitting of the proposed plan set. <br />(2008) <br /> <br />Bonaventure Boulevard Improvements, Weston, Florida. Prepared roadway, signing and pavement <br />marking, SWPPP, and MOT plans for the addition of four left turn lanes on Bonaventure Blvd. Design <br />assistance and Quality Control review of proposed roundabouts for the intersection of Bonaventure Blvd <br />with Saddle Club road as well as Blatt Blvd. (project currently in design) <br /> <br />Page 3112 <br />