Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br /> <br />JENNA CHAMBERLAIN, PE <br />Civil Engineer <br /> <br />SUMMARY OF QUALIFICATIONS <br />Ms. Chamberlain has over six years of experience and has worked on projects from <br />beginning of design to project close out and supporting documents, including <br />_correspondence_and_coordination_with_aIUl1y_olved Rarties. Her experience includes <br />design for drainage, storm water facilities, roadways, signing and pavement markings, <br />plans preparation, traffic control plans, and storm water pollution prevention control <br />plans. Her experience also includes overall project coordination, design, permitting, <br />utility coordination, participation in the quality control process, electronic delivery, and <br />local agency program (LAP) coordination. <br /> <br />PROJECT EXPERIENCE <br />"allandale Beach NE Quadrant Drainage Study & Improvements, Hallandale Beach, <br />FL, Project Engineer. Ms. Chamberlain acted as project engineer and worked on the <br />design and permitting of the project. There are a number of drainage facilities within the <br />200 plus acre project area with limited conveyance capacity and high head loss. Using <br />ICPR, CGA modeled a proposed system of two pump stations connected to sixteen wells <br />while maintaining the existing gravity wells and gravity outfall. These sixteen new wells <br />will be pressurized with fifteen (15) feet of head in order to produce the necessary <br />discharge into the G3 aquifer. FDEP and the Broward County Environmental Resource <br />Department and FDEP have permitted the project. <br /> <br />College Avenue Improvements, Davie, FL - Civil Engineering. Ms. Chamberlain <br />assisted in the design and permitting Of .60 miles of improvements for the Town of <br />Davie including taking a two lane rural section with drainage to a four lane urban <br />section with bike lanes, curbing, median, sidewalk, a new drainage system. lighting" <br />landscaping, and irrigation. The project was permitted through Central Broward Water <br />Control District (CBWCD), South Florida Water Management District (SFWMD), and <br />Broward County Highway Construction and Engineering Division. <br /> <br />Basin 5 Storm Water Master Plan, Dania Beach, FL: Project Engineer -Ms. <br />Chamberlain designed and permitted the improvements contained in the <br />recommendation of the Storm Water Master Plan of Basin 5.. The proposed drainage <br />improvements consist of four duplex pump stations, more than 20,000 linear feet of <br />higher capacity storm sewer to improve storm water conveyance, more efficient <br />discharge outfall systems and exfiltration trenches to improve area water quality. The <br />retrofitted drainage system within the Basin 5 drainage areas attenuates the storm <br />water runoff and reduces the frequency and duration of flooding. <br /> <br />1-95 Design/Build, FDOT District IV, Palm Beach County, Florida. Prepared signing <br />and pavement marking plans as well as participated in QA/QC process. FDOT Project <br />Manager: Henry Oaikhena, PE, (954) 777-4445. (2004) <br /> <br />Okeechobee Boulevard, Palm Beach County, Florida. Prepared roadway plans, <br />signing and pavement marking plans, MOT, as well as drainage details. Also participated <br />in QA/QC process. FDOT Project Manager: Ronald Wallace (954) 777-4641. (2004- <br />2005) <br /> <br />I <br /> <br />I-I <br />I <br /> <br />EDUCATION <br /> <br />B.S., Civil Engineering <br />Florida State University <br />Magna Cum Laude <br /> <br />PROFESSIONAL <br />REGISTRATION <br /> <br />State of Florida, PE, <br />No. 69035 <br /> <br />PROFESSIONAL <br />ASSOCIATION <br /> <br />American Society of <br />Civil Engineers <br /> <br />Florida Engineering Society <br /> <br />National Society of <br />Professional Engineers <br /> <br />Greater Hollywood Chamber <br />of Commerce, Board of <br />Directors <br /> <br />CERTIFICATIONS <br /> <br />Advanced Work Zone Traffic <br />Control <br /> <br />FICE/FOOT Roadway Design <br />Training Expo <br /> <br />Page 3111 <br />