My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
CES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 3:01:54 PM
Creation date
2/9/2012 2:20:33 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />") <br /> <br />o <br /> <br />Consulting Engineering & Science, Inc, <br /> <br />') <br /> <br />Eduardo M. Suarez, PSM, Vice President <br /> <br />REGISTRATION: Florida Registered Surveyor and Mapper LS6313 <br /> <br />EDUCATION: AA--Miami-Dade Community College, 1990 <br /> <br />PROFESSIONAL EXPERIENCE: Mr. Suarez began surveying in 1985, He became a <br />Professional Surveyor and Mapper in 2001, In his 25 years of experience, he has performed a <br />variety of surveying services for the private sector, municipalities and for the State of Florida, His <br />experience-includes:- Boundary,- Topograph ic,-Right-of -Ways,-As-bu ilt's,-and-Geodetic-Surveys, <br />Mr, Suarez has extensive experience in providing surveying services to the Florida Department of <br />Transportation Districts 4 & 6, <br /> <br />#) <br /> <br />~) <br /> <br />PROJECTS EXPERIENCE: <br /> <br />City of Miami Beach Capital Improvements Project Neighborhood No.7 Nautilus: (9 miles) <br />of Topographic Survey / Established vertical and horizontal control for future construction / All <br />utility information provided / Cross sections (spot elevations) / Tree information / All <br />improvements shown from Right-of-Way to Right-of-Way, <br /> <br />City of Miami Glenroyal Corridor Drainage Improvements: . (7,5 miles) of Topographic <br />Survey/ Established vertical and horizontal control for future construction / All utility information <br />provided / Cross sections (spot elevations) / Tree information / All improvements shown from <br />Right-of-Way to Right-of-Way, <br /> <br />Town of Medley, Water Distribution Loop Survey, NW 121 Way from approximately 500 ft. <br />SW of its intersection with FEC railroad to its intersection with 102 Rd.: Performed <br />Topographic Survey, included pavement, curb, and gutter. R/W and Property Line for project area <br />and adjacent properties, Overhead utilities, signs, manholes, catch basins, valves/valve boxes <br />were included in elevation certificate, <br /> <br />SW 192 Street from SW 197 Avenue to SW 177 Avenue (Krome Avenue) (FM No.: 425457-1- <br />52-01): (2 miles) Topographic Survey / Show all improvements from Right-of-Way to Right-of- <br />Way / Establishing Horizontal and Vertical Control for future construction / Cross sections (spot <br />elevations Maintenance R/W SR 9336 with aerial photographs, served as Project Surveyor. <br /> <br />_ Collins_Avenue_(State_Road A-1-A) from_Lincoln Road_to 26 Street (FM No.: 425504-1-52- <br />01): (1,25 miles) Topographic Survey / Show all improvements from Right-of-Way to Right-of- <br />Way / Establishing Horizontal and Vertical Control for future construction / Cross sections (spot <br />elevations), <br /> <br />1-75/SR826 PD & E Study from NW 103 St to Miami-Dade/Broward County Line (FM No.: <br />420669-1-22-01): 10 miles) Topographic Survey / -Show all improvements from Right-of-Way to <br />Right-of-Way / Establishing Horizontal and Vertical Control for future construction / Set Aerial <br />, Targets for Photogrammetry Control/Cross Sections (spot elevations, <br /> <br />E06-WASD-06 72-lnch Raw Water Pipeline along NW 58 St from Turnpike to NW 72 Ave: (5 <br />miles)-Topographic Survey / Show all improvements from Right-of-Way to Right-of-Way / <br />Establishing Horizontal and Vertical Control for future construction / Cross sections (spot <br />elevations) / All utility information provided / Tree descriptions, <br /> <br />NE 87th St. from NW 2nd Ave. to Farm Road and along N Miami Ave., City of EI Portal, New <br />Millennium Design Consultants-Prime: Horizontal and Vertical Control Survey, Topographic <br />Survey, Digital Terrain Model (DTM), served as Project Surveyor. <br /> <br />E07-WASD-07A Design of Distribution of Pipeline for Reclaimed Water System from <br />Central District Wastewater Treatment Plant to Key Biscayne (5 miles) including the Bear <br />Cut Channel Survey:, (5 miles) Survey-Topographic Survey / Show all improvements from <br />Right-of-Way to Right-of-Way / Establishing Horizontal and Vertical Control for future construction <br />/ Cross sections (spot elevations) / All utility information provided / Tree descriptions, <br /> <br />It) <br /> <br />J <br />t <br />r <br />I <br />I <br /> <br />I <br />I I <br /> <br />I <br /> <br />I <br /> <br />City RFP No, 11-11-02 <br /> <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.