|
<br />1
<br />")
<br />
<br />o
<br />
<br />Consulting Engineering & Science, Inc,
<br />
<br />,
<br />
<br />Jose Senas, PSM, Project Surveyor QAlQC Officer
<br />
<br />REGISTRATION: Florida Registered Surveyor and Mapper No, LS5938
<br />
<br />EDUCATION: Surveying I and II Courses at Miami-Dade Community College, ESRI Training,
<br />Various Surveying Seminars, National Spatial Reference System, North American Vertical Datum
<br />of 1988(NA VD 88) and State Plane Coordinates and the National Spatial Reference System,
<br />Various Surveying Seminars, .
<br />
<br />PROFESSIONAL EXPERIENCE: Mr, Senas a Professional Surveyor and Mapper with over 24
<br />years of experience, Mr, Senas has extensive experience in Land Title Surveys, Topographic
<br />Surveys, Specific Purpose Surveys, AL T A / ACSM Land Title Surveys, As-Built Surveys (Water &
<br />Sewer Systems, Pavement and Drainage, Radius Maps, Cross Sections and intersection profiles,
<br />Site Plans, Record Plats, and Condominium Surveys, Preparation of Right-of-Way Maps under
<br />the Florida Department of Transportation Standards for FDOT District VI Office in US Survey Foot
<br />and Metric Systems for the acquisition of private lands for the public domain, Preparation of a
<br />Mean High Water Survey under the Florida Department of Environmental Protection Standards
<br />for Miami-Dade County Authorities, Preparation of Condominium Exhibits (pre and post
<br />construction phases) for legal recordation under the State of Florida statutes, He has also
<br />prepared Legal Descriptions, Office Computations based on field traverses to conciliate legal or
<br />record boundaries with actual evidence of monumentation.. Mr. Senas is responsible for the
<br />coordination of the major aspects of each project from its approval to its completion and by
<br />applying design criteria and Land Surveying technical Standards,
<br />
<br />PROJECTS EXPERIENCE:
<br />
<br />Town of Medley Flood Mitigation Project: Right of Way Mapping and Topographic Survey of
<br />over 36,000 LF, of Section 4-53-40, lying Southwesterly of the F,E,C, Rail Road,
<br />
<br />Miami Dade County, South Florida Water Management, Amelia Park: Provided Map and
<br />Topographic Survey, identified all trees with the survey area, obtain elevations, and prepared
<br />plan view of survey at 1" =50'
<br />
<br />Miami-Dade County Transit ROW & Util. Division, MIC Earlington Heights Connector
<br />Project: Provided Map of Boundary and Topographic Survey for the acquisition of 5 parcels of
<br />-land for-the ~MIC Earlington Heights project~ for MD -County- Transit ROW & Utility-Division
<br />Overtown Transit Village,
<br />
<br />Miami-Dade Public Works Department, SW 2ih Avenue from US1 to Bay Shore Drive:
<br />Boundary, Topographic, & Specific Purpose Survey for Miami Dade County Public Works Right of
<br />Way Division, Provided location of all visible fixed improvements within project limits, including
<br />roadway pavement, driveways (type of driveways), sidewalks, walkways, mailboxes, fences, trees
<br />(including trunk diameter), etc, Provided locations of all visible above ground utilities, Invert
<br />elevations for existing storm water and sanitary manholes, and/or existing inlets and catch basins,
<br />Right-of-way lines from Plats for SW 27th Ave and all cross streets,
<br />
<br />Town of Medley, Survey of Bridge on 116th Way from Okeechobee Rd. to South River Dr.:
<br />Performed Topographic Survey of the entire Bridge over Miami Canal from Okeechobee Rd to
<br />South River Drive,
<br />
<br />Town of Medley, NW 106 Street to NW 89 Street: Map of Topographic Survey, Researched
<br />the Right of Way information within Miami-Dade County Right of Way Division and the Town of
<br />Medley, Located all visible fixed improvements within the right of way including roadway
<br />pavements, driveway, sidewalks, poles, walkways, mailboxes, fences, trees, water meters, etc,
<br />
<br />Miami Dade Seaport of Miami, Cruise Terminal D & Terminal E Improvements:
<br />Miscellaneous Construction Survey Services, Performed all construction layout services for the
<br />entire project, requested for modification and improvement to optimize the use of existing Cruise
<br />Terminals D and E,
<br />
<br />I")
<br />
<br />t )
<br />
<br />I )
<br />
<br />I )
<br />
<br />City RFP No, 11-11-02
<br />
<br />23
<br />
|