Laserfiche WebLink
<br />I, <br /> <br />([S) <br /> <br />Consulting Engineering & Science, Inc, <br /> <br />4. Approach / Methodology <br /> <br />) <br /> <br />The City of Sunny Isles Beach has issued a Request for Qualifications (RFQ) for the <br />services of a civil engineering professionals to submit qualifications to design a <br />permittable set of street and drainage improvement plans for the 100% complete design <br />development for the construction of a drainage system along 174th Street from Collins <br />Avenue (SRA-IA) west to just beyond the first complex curve. The proposed drainage <br />system will alleviate the stormwater runoff on the roadway in the area and discharge it <br />into a deep well or an outfall or a combination. <br /> <br />I <br />I <br />Ie) <br />I <br />I <br />I ) <br />I <br />I <br /> <br />The RFQ states that the selected Consultant shall provide Civil Engineering, Survey and <br />Geotechnical services for the development of construction plans for the proposed <br />improvements, The work shall include, but not be limited to, conducting <br />boundary/topographic surveys, geotechnical surveys, utility data collection, sub-surface <br />. surveys, percolation tests and other applications deem necessary to design the drainage <br />system for this portion of the corridor; coordination with the staff from the Miami-Dade <br />County DERM, the City of Sunny Isles, Miami-Dade County, private owners and others <br />for preliminary reviews and comments; preparation of construction plans; permitting and <br />project closeout. <br /> <br />The CES Team project approach is task based incorporating the scope of services that are <br />required for the success of this project. The major tasks are to include: <br /> <br />) <br /> <br />t ) <br /> <br />1. Task: Pre-Engineering & Data Collection <br />2. Task: Design Development <br />3. Task: Permitting <br />4. Task: Construction Documents <br />5. Task: Bidding & Award <br />6, Task: Administration <br /> <br />Task 1: Pre-Engineering & Conceptual Design <br /> <br />This task is easily the most important to the overall success of the project. In addition to <br />initiating a working relationship with the City's project team, it is the task where most of <br />the important information for the project will be collected, assembled and generated. This <br />task will begin conducting the necessary field survey such as geotechnical, soil surveys, <br />boundaries, topography, sub-surface surveys, etc, Deliverables will include geotechnical <br />and soil survey repOlis, along with boundary/topographic surveys, etc. A detailed <br />inventory of the existing conditions will be prepared which will include but not limited to <br />existing roadway characteristics, existing drainage systems, existing right-of-way <br />easements, existing utilities, etc. Meetings with all the appropriate regulatory agencies to <br />review the project and establish each agency's conditions of approval will also be <br />conducted. These early meetings with the agencies will serve well to generate the <br />confidence of agency staff in the project and the CES Team. <br /> <br />City RFP No, 11-11-02 <br /> <br />25 <br />