My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Craven Thompson & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 3:31:13 PM
Creation date
2/9/2012 3:27:24 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />) <br />) <br />) <br />) <br />) <br />) <br />) V'l <br />) C <br />0 <br />) +-' <br />) ro <br />u <br />) .- <br />4- <br />) ro <br />) :J <br />) a <br />) N <br />) C <br />) 0 <br />) -i--' <br />U <br />) CLJ <br />) V) <br />) <br />) <br /> <br />CRftolEN 1ffOI\I1PSON <br /> <br />fj <br /> <br />a ASSOCII>JES INC <br /> <br />CITY OF SUNNY ISLES BEACH RFQ NO. 11-11-02 <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS <br /> <br />NORTH COLLECTOR DRAINAGE PROJECT <br />CITY OF AVENTURA, FLORIDA <br /> <br /> <br />PROJECT ROLE: <br />Prime Consultant <br /> <br />OWNER / CLIENT: <br />Mr. Tony Tomei <br />Capital Projects Manager <br />City of Aventura <br />19200 W. Country Club Drive <br />Aventura, Florida 33180 <br />Phone: (305) 466-8923 <br />Fax: (305) 466-8939 <br />Email: ttomei@cityofaventura.com <br /> <br />TOTAL CONSTRUCTION COST: <br />$980,180.00 <br /> <br />CTA FEES: <br />Contract Amount - $89,500.00 <br />Final Billed Amount - $88,101.05 <br /> <br />PROJECT START DATE: <br />November 2005 <br /> <br />PROJECT COMPLETION DATE: <br />September 2007 <br /> <br /> <br />The 209th Avenue Drainage Project included <br />the design, permitting, coordination with <br />the Florida Department of Transportation <br />and installation of drainage improvements <br />to the serve the City of Aventura's Hospital <br />District, located west of Biscayne Boulevard <br />and north of NE 209th Street. This area had <br />experienced localized flooding during heavy <br />rainfall events due to the lack of a positive <br />drainage outfall. The drainage <br />improvements included the extensions of <br />48-inch and 54-inch drainage culverts within <br />the Hospital District; the modification to an <br />existing control structure on the east side of <br />Biscayne Boulevard and the installation of <br />drainage wells within the Hospital District <br />area. The project was constructed in several <br />phases due to limitations of the existing <br />conditions. <br /> <br /> <br />CRAVEN THOMPSON & ASSOCIATES, INC. <br />ENGINEERING - SURVEYING - LANDSCAPE ARCHITECTURE - PLANNING <br /> <br />2116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.