Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br /> V'l <br />) C <br />) 0 <br />) ~ <br />ro <br />) u <br /> 4- <br />} <br />) ro <br />::J <br />} c::J <br />) <br />) N <br />) C <br />0 <br />) +-J <br />) U <br />CLJ <br />. V') <br />) <br />) <br />) <br />) <br />) <br /> <br />CR>lIEN 1HQMPSON <br /> <br />fj <br /> <br />& ASSOCI!>JES INC. <br /> <br />CITY OF SUNNY ISLES BEACH RFQ NO. 11-11-02 <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS <br /> <br />BOWMAN STREET DRAINAGE OUTFALL <br />CITY OF GREENACRES, FLORIDA <br /> <br /> <br />",~{' ___..-L <br />", <br /> <br /> <br />Craven Thompson & Associates (CTA) <br />researched and evaluated several <br />options to relieve street flooding on <br />Bowman Street in the City of <br />Greenacres. The option that was <br />selected was the installation of 667 feet <br />of 4'x4' and 8'x4' exfiltration trench, and <br />upsizing and existing 18" and 24" RCP <br />outfall with 191x30" and 241x38" HERCP. <br /> <br />CLIENT: <br />Mr. Terry Siegall, AlA <br />Capital Projects Coordinator <br />City of Greenacres <br />5800 Melaleuca lane <br />Greenacres, Fl 33463 <br /> <br />CTA FEES: <br />Contract: $76,624.84 <br />Billed: $48,944.40 <br /> <br />CT A provided design, permitting and <br />construction phase services for the <br />improvements. Permitting agencies <br />involved: Palm Beach County land <br />Development Division, lake Worth <br />Drainage District, and South Florida <br />Water Management District. <br /> <br />DESIGN START DATE: <br />September 2008 <br /> <br />CONSTRUCTION START DATE: <br />December 2009 <br /> <br />CONSTRUCTION COMPLETION DATE: <br />October 2010 <br /> <br /> <br />APPROXIMATE CONSTRUCTION COST: <br />$200,000.00 <br /> <br />CRAVEN THOMPSON & ASSOCIATES, INC. <br />ENGINEERING - SURVEYING - LANDSCAPE ARCHITECTURE - PLANNING <br /> <br />2117 <br />