My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Craven Thompson & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 3:31:13 PM
Creation date
2/9/2012 3:27:24 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />) <br />) <br />) <br />) <br />) <br />) <br /> V) <br />) c <br />) 0 <br />) +oJ <br />ro <br />) u <br />.- <br /> 4- <br />) <br />) ro <br />:J <br />) cJ <br />) <br />) N <br />) C <br />0 <br />) +-1 <br />) U <br />a.> <br />) V") <br />) <br />) <br />) <br />) <br /> <br />CR~EN lHOMPSON <br /> <br />f1 <br /> <br />& ASSOCIJlJES INC. <br /> <br />CITY OF SUNNY ISLES BEACH RFQ NO. 11-11-02 <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS <br /> <br />N.E. 5th AVENUE RECONSTRUCTION (FROM OAKLAND PARK BLVD. TO N.E. 38th STREET) <br />CITY OF OAKLAND PARK, FLORIDA <br /> <br />"'" _DIl-_&T'" <br /> <br /> <br />BEFORE <br /> <br />OWNER/CLIENT: <br />Mr. Harris Hamid, P.E., Director <br />Engineering and Community Development <br />City of Oakland Park <br />Oakland Park, Fl33334 <br />Phone: (954) 630-4475 <br />Email: harrish@oaklandparkfl.org <br /> <br />DESIGN START DATE: June 2009 <br /> <br />CONSTRUCTION START DATE: June 2010 <br /> <br />CONSTRUCTION COMPLETION DATE: <br />April 2011 <br /> <br />DESIGN COST: $215,700.00 <br /> <br />CONSTRUCTION COST: <br />Engineer's Estimate: $2 Million <br />Final Cost: $1.8 Million <br /> <br /> <br />AFTER <br /> <br />The City of Oakland Park awarded Craven <br />Thompson & Associates the design contract for <br />the roadway, drainage, landscape and <br />streetscape improvements to the N.E. 5th <br />Avenue Corridor from Oakland Park Blvd. to <br />N.E. 38th Street; approximately 0.60 miles. The <br />civil engineering services included: full roadway <br />reconstruction design, stormwater <br />management ADICPR modeling and design, <br />utility coordination and relocation, and all <br />associated jurisdictional permitting. This <br />project utilized federal grant funding for <br />construction; specifically a Community <br />Development Block Grant - Recovery Project <br />Fund (CDBG-R) for which Craven Thompson <br />and Associates played a vital role in helping the <br />City of Oakland Park procure. <br /> <br /> <br />BEFORE <br /> <br />AFTER <br /> <br />CRAVEN THOMPSON & ASSOCIATES, INC. <br />ENGINEERING - SURVEYING - LANDSCAPE ARCHITECTURE - PLANNING <br /> <br />2118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.