Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br />) V') <br />) c <br />) 0 <br />.f-J <br />) ro <br />u <br />) .- <br />4- <br />) ro <br />) ::J <br />) Cf <br />) N <br />) C <br />) 0 <br />) -+-.J <br />U <br />) OJ <br />) V') <br />) <br />) <br />) <br />) <br />) <br /> <br />C~EN 'IffO/II1PSON <br /> <br />fj <br /> <br />a ASSOCIJ>JES INC. <br /> <br />CITY OF SUNNY ISLES BEACH RFQ NO. 11-11-02 <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS <br /> <br />NORTH COUNTY NEIGHBORHOOD IMPROVEMENT PROJECT <br />NORTHEAST QUADRANT, POMPANO BEACH, FLORIDA <br /> <br />OWNER / CLIENT: <br />Mr. Alan Garcia, P.E., Director <br />Broward County Water and Wastewater Services <br />2555 West Copans Road <br />Pompano Beach, Florida 33066 <br />Phone: 954.831.0747 <br />Email: agarcia@broward.org <br /> <br />CTA CONTRACT AMOUNT: $11,668,668.00 <br /> <br />ENGINEER'S CONSTRUCTION ESTIMATE: <br />$40,000,000.00 <br /> <br />CHANGE ORDERS: None to date <br /> <br /> <br />PROJECT START / COMPLETION DATES: <br /> <br />Bid Package 9 <br />Design Start - March 2007 <br />Design Completion - Sept. 2009 <br />Anticipated Const. Start - 2010 <br />Anticipated Const. Completion - 2012 <br /> <br />Bid Package 10 <br />Design Start - October 2007 <br />Design Completion - March 2010 <br />Anticipated Const. Start - 2011 <br />Anticipated Const. Completion - 2013 <br /> <br />Bid Package 11 <br />Design Start - November 2009 <br />Design Completion - February 2011 <br />Anticipated Const. Start - 2011 <br />Anticipated Const. Completion - 2013 <br /> <br />The North County Neighborhood Improvement Project (NCNIP) Northeast Quadrant includes <br />approximately 720 acres of land between Dixie Highway and Federal Highway, North of Sample <br />Road in Pompano Beach. The infrastructure improvements to the existing neighborhood <br />included new water, sanitary sewer, drainage, landscaping, signage, and sidewalk systems. This <br />area is primarily residential, built in the 1950's and early 1960's. The area was developed with <br />limited sanitary sewer system, no drainage and an inadequate water distribution system. As a <br />result of aging and inadequate infrastructure, Broward County selected Craven Thompson and <br />Associates, Inc. to design infrastructure improvements needed in the area and as the Resident <br />Project Representative during construction. Construction cost for these improvements were <br />over 40 million dollars. Broward County elected to proceed with our recommendations. Craven <br />Thompson and Associates, Inc. has completed the design for this project. All phases are now in <br />construction phase with an anticipated construction completion date in 2013. This project <br />required coordination with several different municipalities and agencies. An interlocal <br />Agreement was worked out with the City of Pompano Beach. A reclaimed water distribution <br />system will be installed for future use by residents. The force main transmission system will be <br />upgraded as part of the scope also. <br /> <br />CRAVEN THOMPSON & ASSOCIATES, INC. <br />ENGINEERING - SURVEYING - LANDSCAPE ARCHITECTURE - PLANNING <br /> <br />2124 <br />