Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />~ n: rroJYJqp <br /> <br />20 Mile FPL Reclaimed Water Line - Palm Beach County 2007 - 2008 <br />Palm Beach County Public Works Division <br />Designate underground utilities to depict conflicts in the route of the Reclaimed water line that FPL <br />intends to use for their Plant. Test holes perfomled after designation was complete. We were sub <br />consultant to Heller, Weaver and Sheremeta under the supervision ofMr. John Rich, PBC Head <br />Engineer. <br /> <br />Port of Palm Beach, Port Authorities - Ongoing <br />Kimley-Hom Associates <br />Designate underground utilities to depict structure conflicts as requested by client. Test Holes <br />performed. <br /> <br />SR 60 Proposed Structures, Districtwide Utility Locating Contract - FDOT District 4 <br />SR 60, Indian River County. Locate utility conflicts for the proposed drainage structures, mast arm <br />locations and light pole locations. Infamap Corp Project Report/Scope detailed Utility Locating and <br />Designation for FDOT review, accumulating 222 test hole locations. <br /> <br />Campus Utility Locates - Florida International University - Present <br />C3TS Engineering & Architects <br />Utility Location Survey and Designated throughout multiple campus areas. <br /> <br />St. Lucie Waste Water Treatment Plant - Numerous Phases <br />St Lucie West Service District <br />Underground Utility Targeting and Test Hole services providing utility maps. Controlled survey <br />performed at areas of detailed specifications requested. Information assisted in plant maintenance. <br /> <br />Jensen Beach Blvd IRP Phase, Martin County 11-01-12/2010 <br />Kimley Horn & Associates <br />Utility depiction at the areas specifies for proposed structures by clients entailed approximately thrity <br />test hole locations. The project was completed prior to deadline and deliverables submitted multiple <br />formats. Close coordination with municipalities by our Project Manager assisted the rapid turnaround. <br /> <br />North County Neighborhood Improvement Projects - Multiple Phases <br />Craven Thompson & Associates <br />Urban Redevelopment projects in Broward County mostly for watermain improvements. Test Hole <br />projects underway year round. Completion entailed client submittal and careful utility conflict <br />investigation. <br /> <br />City of Delray Beach Reclaimed Water Expansion Aug 2011 <br />Mathews Consulting, Inc. <br />Project consisted of over one hundred test hole locations for proposed design and water installation. <br />Targeting utilities in conflict as well as pinpointing exsisting structures. <br /> <br />L I LO> <br />