|
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />
<br />CR~EN tHM1PSON
<br />
<br />fj
<br />
<br />& ASSOCIIoJES INC
<br />
<br />CITY OF SUNNY ISLES BEACH RFQ NO. 11-11-02
<br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS
<br />
<br />PATRICK J. GIBNEY, P.E.
<br />Senior Supervising Engineer
<br />
<br />Town of Davie CRA Eastside Master Plan - Preparation and Permitting of 340 Acre
<br />Master Drainage Plan, Master Wastewater Plan and Master Water System Plan
<br />including modeling of drainage, wastewater and water system.
<br />
<br />CityPlace, West Palm Beach - Preparation of Infrastructure Master Plan for the
<br />creation of the CityPlace Community Development District, Site Plan, Engineering
<br />Plans and Construction Documents for 40 acre City Place Phase 1, Renaissance
<br />Project Phase 1, complete site coordination with numerous Clients, Architects,
<br />Mechanical Consultants, Electrical Consultants, Fountain Consultants, Utility
<br />Companies, City, County, SFWMD, FOOT.
<br />
<br />North Central County Neighborhood Improvements Project, Broward County -
<br />Preparation of Basis of Design Report, Contract Documents, Permitting and
<br />Construction Management for 980-acre retrofit infrastructure improvements
<br />within unincorporated Broward County
<br />
<br />Central County Neighborhood Improvements Project, Broward County
<br />Preparation of Basis of Design Report, Construction Documents, Permitting and
<br />Construction Management for 1,800 acre retrofit infrastructure improvements
<br />within unincorporated Broward County. Client: Broward County Office of
<br />Environmental Services.
<br />
<br />City of Miami Gardens livable Neighborhoods Improvements Project
<br />Project Manager responsible for the preparation of a Basis of Design Report for
<br />four (4) communities that included storm drainage, lighting and streetscape
<br />improvements within the City of Miami Gardens, Florida. Project involves
<br />extensive storm water modeling utilizing ICPR software, community involvement
<br />presentations, and the development of construction drawings and specifications.
<br />Preparation of design plans for one (1) community, Kings Gardens II, including
<br />survey, storm drainage, lighting and landscape design as well as construction
<br />observation services.
<br />
<br />CityPlace, West Palm Beach - Preparation of Infrastructure Master Plan for the
<br />creation of the CityPlace Community Development District, Site Plan, Engineering
<br />Plans and Construction Documents for 40 acre City Place Phase 1, Renaissance
<br />Project Phase 1, complete site coordination with numerous Clients, Architects,
<br />Mechanical Consultants, Electrical Consultants, Fountain Consultants, Utility
<br />Companies, City, County, SFWMD, FOOT.
<br />
<br />South County Neighborhood Improvements Project, Broward County, Fl -
<br />Preparation of Basis of Design Report, Construction Documents, Permitting and
<br />Construction Management for 1,400 acre retrofit infrastructure improvements
<br />within unincorporated Broward County. Client: Broward County Office of
<br />Environmental Services.
<br />
<br />CRAVEN THOMPSON & ASSOCIATES, INC.
<br />ENGINEERING - SURVEYING -LANDSCAPE ARCHITECTURE - PLANNING
<br />
<br />3120
<br />
|