Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />CR~EN tHM1PSON <br /> <br />fj <br /> <br />& ASSOCIIoJES INC <br /> <br />CITY OF SUNNY ISLES BEACH RFQ NO. 11-11-02 <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS <br /> <br />PATRICK J. GIBNEY, P.E. <br />Senior Supervising Engineer <br /> <br />Town of Davie CRA Eastside Master Plan - Preparation and Permitting of 340 Acre <br />Master Drainage Plan, Master Wastewater Plan and Master Water System Plan <br />including modeling of drainage, wastewater and water system. <br /> <br />CityPlace, West Palm Beach - Preparation of Infrastructure Master Plan for the <br />creation of the CityPlace Community Development District, Site Plan, Engineering <br />Plans and Construction Documents for 40 acre City Place Phase 1, Renaissance <br />Project Phase 1, complete site coordination with numerous Clients, Architects, <br />Mechanical Consultants, Electrical Consultants, Fountain Consultants, Utility <br />Companies, City, County, SFWMD, FOOT. <br /> <br />North Central County Neighborhood Improvements Project, Broward County - <br />Preparation of Basis of Design Report, Contract Documents, Permitting and <br />Construction Management for 980-acre retrofit infrastructure improvements <br />within unincorporated Broward County <br /> <br />Central County Neighborhood Improvements Project, Broward County <br />Preparation of Basis of Design Report, Construction Documents, Permitting and <br />Construction Management for 1,800 acre retrofit infrastructure improvements <br />within unincorporated Broward County. Client: Broward County Office of <br />Environmental Services. <br /> <br />City of Miami Gardens livable Neighborhoods Improvements Project <br />Project Manager responsible for the preparation of a Basis of Design Report for <br />four (4) communities that included storm drainage, lighting and streetscape <br />improvements within the City of Miami Gardens, Florida. Project involves <br />extensive storm water modeling utilizing ICPR software, community involvement <br />presentations, and the development of construction drawings and specifications. <br />Preparation of design plans for one (1) community, Kings Gardens II, including <br />survey, storm drainage, lighting and landscape design as well as construction <br />observation services. <br /> <br />CityPlace, West Palm Beach - Preparation of Infrastructure Master Plan for the <br />creation of the CityPlace Community Development District, Site Plan, Engineering <br />Plans and Construction Documents for 40 acre City Place Phase 1, Renaissance <br />Project Phase 1, complete site coordination with numerous Clients, Architects, <br />Mechanical Consultants, Electrical Consultants, Fountain Consultants, Utility <br />Companies, City, County, SFWMD, FOOT. <br /> <br />South County Neighborhood Improvements Project, Broward County, Fl - <br />Preparation of Basis of Design Report, Construction Documents, Permitting and <br />Construction Management for 1,400 acre retrofit infrastructure improvements <br />within unincorporated Broward County. Client: Broward County Office of <br />Environmental Services. <br /> <br />CRAVEN THOMPSON & ASSOCIATES, INC. <br />ENGINEERING - SURVEYING -LANDSCAPE ARCHITECTURE - PLANNING <br /> <br />3120 <br />