Laserfiche WebLink
E <br />This drainage and street improvement project is part of the Comprehensive Plan to alleviate flooding <br />problems throughout the City of Sunny Isles Beach. BHA's approach to solve the flooding problems of <br />the Central Island neighborhood was to utilize infiltration wells. <br />This drainage and street improvement project is the first of its kind to utilize 25 injection wells for flood <br />control. The injection wells are modeled to equalize runoff injection to the aquifer level. Estimated con- <br />struction cost is $ 3.8 million. <br />